The site has been historically undeveloped for housing or industrial buildings; from the during the second half of the 19th century a tramway (siding) running from the London to Bedford line accessed the site; the site remained occupied by rail sidings throughout the 20th century. In the early 2000s the construction of phase 2 of the
Channel Tunnel Rail Link required a 25-week closure of the railway line between
King's Cross and
Kentish Town; this blockade would prevent easy access of trains of the London-Bedford line to their traditional servicing facilities at
Selhurst depot in south London. As a result,
Railtrack calculated it would be cost effective to construct a depot at Bedford to service the trains, and for future use, including as a depot for the
Thameslink Programme expansion. The sidings at Bedford station were to be retained for storing trains. Fitzpatrick contractors Ltd. was given a £11 million contract to build a four road train shed for the
Class 319 EMUs, which in addition to the construction of the main train service and maintenance building included stabling for 22 four car trains, a train wash, and controlled emission toilet servicing. The main building was . The depot opened 3 November 2004. The initial allocation was 43 Class 319s. In 2006
First Capital Connect (FCC) commenced operating the
Thameslink franchise and the depot's maintenance allocation was increased to include all of FCC's 76 four car Class 319s. In 2009 the depot's allocation increased to 82 Class 319s. As part of the
Thameslink Programme another 4 class 319 trains were added, and the depot was extended to five roads for the addition of a further 23 four car
Class 377 EMU trains to the depot's responsibilities.
VolkerFitzpatrick was awarded the main contract for the £2.2 million extension. The depot extension was opened in January 2009. The delivery of the class 377 trains was delayed by a year, and the initial Class 377/5 was returned to the manufacturer due to the number of faults found, resulting in a further delay to introduction of the fleet. In September 2019, with the cascade of new rolling stock having displaced all Class 319 trains from Thameslink services, the Depot ceased to be a maintenance Depot, although it continued to be used for cleaning and train presentation servicing. In 2021, Rolling Stock maintenance work restarted at the Depot, when Siemens, working on behalf of
East Midlands Railway, began to use the depot to maintain its fleet of
Class 360s, used on
London St Pancras to
Corby services. The maintenance is carried out by
Siemens Mobility, under a Train Services Agreement. ==References==