MarketBlockhaus d'Éperlecques
Company Profile

Blockhaus d'Éperlecques

The Blockhaus d'Éperlecques is a Second World War bunker, now part of a museum, near Saint-Omer in the northern Pas-de-Calais département of France, and only some 14.4 kilometers north-northwest from the more developed La Coupole V-2 launch facility, in the same general area.

Background
The A-4 ballistic missile (referred to as the V-2 from September 1944) was developed by the Germans between 1939 and 1944. It was regarded by Adolf Hitler as a Wunderwaffe (wonder weapon) that he believed to be capable of turning the tide of the war. Its operational deployment was restricted by several factors. Large supplies of cryogenic liquid oxygen (LOX) were required as the oxidizer to fuel the missiles. LOX evaporates rapidly, necessitating a source reasonably close to the firing site in order to minimise loss through evaporation. Germany and the occupied countries did not at that time have sufficient manufacturing capacity for the amount of LOX required for a full-scale A-4 campaign; the total production capacity in 1941 and 1942 was about 215 tons daily, but each A-4 launch required about 15 tons. As the missile was intended for use against London and southern England, its operational range of meant that the launch sites had to be located fairly close to the English Channel or southern North Sea coasts, in northern France, Belgium or the western Netherlands. This was within easy reach of the Allied air forces, so any site would have to be able to resist or evade the expected aerial bombardments. Various concepts were mooted for the A-4's deployment in a March 1942 study by Walter Dornberger, the head of the A-4 development project at the Peenemünde Army Research Center. He suggested that the missiles should be based in heavily defended fixed sites of a bunker-style design similar to the massive submarine pens then under construction in occupied France and Norway. The rockets could be stored in such sites, armed, fuelled from an on-site LOX production plant, and launched. This offered significant technical advantages; not only would the LOX loss be minimised, but the complex process of pre-launch testing would be simplified. A high rate of fire could be sustained as the facility could effectively operate like a production line, sending a steady flow of missiles to the launch pads. Speer gave orders that two bunkers were to be constructed by the Organisation Todt construction group to a "special fortification standard" (Sonderbaustärke), requiring a steel-reinforced concrete ceiling thick and walls thick. They would be built near the coasts opposite England, one on the Côte d'Opale near Boulogne-sur-Mer and the other on the Cotentin Peninsula near Cherbourg. Each would be capable of launching 36 missiles a day, would hold sufficient supplies of missiles and fuel to last three days, and would be manned by 250 troops. ==Design and location==
Design and location
In December 1942, Speer ordered Peenemünde officers and engineers (including Colonel Gerhard Stegmair, in the Forest of Éperlecques, near Saint-Omer in the Pas-de-Calais department. It was given the cover name of Kraftwerk Nord West (Northwest Power Plant). By mid-February 1943 Dornberger decided that the bunker should include liquid oxygen production with five machines and a monthly capacity of 1500 tons. The location was conveniently close to the main railway line between Calais and Saint-Omer, the canalised river Aa, main roads and electric grid lines. Situated from London, it was far enough inland to be safe from naval guns and it was sheltered to an extent by a ridge that rises to a height of to the north. At nearby Saint-Omer, there was a major Luftwaffe base which was capable of providing air defence for the area. There were existing gravel and sand quarries as well as cement works in the vicinity, which would help with the enormous amount of material that would be needed for the construction works. The quantities required were very substantial indeed; 200,000 tons of concrete and 20,000 tons of steel would be required to build the facility. When US Army Major General Lewis H. Brereton inspected the site after it had been captured by the Allies, he described the bunker as "more extensive than any concrete constructions we have in the United States, with the possible exception of Boulder Dam." and at Stenay but the latter option was abandoned in favour of installing a LOX production facility within the Watten bunker. On the north side of the building was a fortified standard gauge railway station, linked to the main Calais-Saint-Omer line at Watten via a spur line. Missiles, warheads and other components would be shipped to the station and transported on trucks into the main area of the bunker. Here the rockets were to be assembled, raised into a vertical position and fuelled and armed. From the arming halls, they would be moved to either end of the building through pivoting doors high. They would exit through the south face of the building and would be moved on tracks to the launch pads. There were no doors on the exit portals so chicanes were installed in the exit passage to deflect the blast of rockets being launched from outside. Launches would be overseen from a command tower located in the centre of the south side of the bunker, overlooking the launch pads. ==Construction==
Construction
The site was designed in January and February 1943 by engineers from the Peenemünde research facility and the Organisation Todt. On 25 March 1943 the construction plans were presented to Hitler, who immediately gave the go-ahead for the project to begin. It was envisaged that the structure would be ready by the end of July 1943, though not its wiring and plant, and it was intended that it would be fully operational by 1 November 1943. The non-German workers lived in two camps officially known as Organisation Todt Watten Zwangsarbeitslager 62 (Forced Labour Camp 62) about distant from the site, near the village of Éperlecques. The camps were guarded by the French civil police with the assistance of Belgian and Dutch Nazis and Russian POWs who had volunteered for guard duty. Although escape attempts were punished by immediate execution, there were up to three escapes daily with external assistance. The commandant of the camp is said to have complained that it would have been easier to "guard a sack of fleas". The labourers worked in 12-hour shifts of 3,000–4,000 men, with three 20-minute breaks during each shift. The work continued around the clock, seven days a week, under giant floodlights during the night. The living and working conditions were extremely harsh, especially for the political prisoners and the eastern Europeans, who were given especially punitive treatment due to their status as the most expendable members of the workforce. For the non-German workers, falling ill or being unable to work through injury was the equivalent of a death sentence, as they would either be left to die or be transported back to the concentration camps from which they had been brought. A large supply dump was established at Watten next to the River Aa. This site was eventually used to store material required for all the V-weapon sites in the Saint-Omer area. An old quarry at Wizernes codenamed '''' (Gravel Quarry Northwest), some south of Watten, was also converted into a storage dump to supply the Watten facility. ==Discovery and Allied attacks==
Discovery and Allied attacks
In early April 1943, an Allied agent reported "enormous trenches" being excavated at the Watten site, and on 16 May 1943 an RAF reconnaissance mission led to Allied photographic interpreters noticing unidentified activity there. Other large facilities were observed to be under construction elsewhere in the Pas-de-Calais. The purpose of the construction works was very unclear; Lord Cherwell, Winston Churchill's scientific adviser, admitted that he had little idea what "these very large structures similar to gun emplacements" were but he believed that "if it is worth the enemy's while to go to all the trouble of building them it would seem worth ours to destroy them." At the end of May, the British Chiefs of Staff ordered that aerial attacks be carried out against the so-called "heavy sites" being built by the Germans. The British Chiefs of Staff noted that a daylight attack by US bombers was under consideration but they raised objections to the proposal, as the Air Staff thought that Watten had nothing to do with rockets, suggesting that instead it might be merely a "protected operations room". bomb to the roof on the south side of the bunker, photographed after the war in 1951 Only 35% of the Watten bunker had been completed by this time. It was clearly no longer possible to use it as a launch site, but the Germans still needed LOX production facilities to supply V-2 sites elsewhere. After surveying the site in September and October 1943, Organisation Todt engineers determined that the northern part of the facility was irretrievably damaged but decided to focus on completing the southern part to serve as a LOX factory. One of OT's engineers, Werner Flos, came up with an idea to protect the bunker from bombardment by building it up from the roof first. This was done by initially constructing a concrete plate, flat on the ground, which was thick and weighed 37,000 tons. It was incrementally raised by hydraulic jacks and then supported by walls which were built underneath it as it was raised, becoming the roof. The resulting concrete cavern was intended to be used by the Germans as a bombproof liquid oxygen factory. The thickness of the roof was chosen on the assumption that Allied bombs were incapable of penetrating such a depth of concrete; the Germans, however, were unaware of the British development of earthquake bombs. By the time of the D-Day landings, the foundations for five machines were finished and three were installed. On 1 July Dornberger ordered the removal of the machines. On 3 July 1944, Oberkommando West gave permission to stop construction at both sites, which had been so disrupted by bombing that work could no longer proceed. Three days later an Allied raid succeeded in wrecking the interior of the Watten bunker with a Tallboy bomb that brought down part of the roof. Finally, on 18 July 1944, Hitler decreed that plans for launching missiles from bunkers need no longer be pursued. Dornberger's staff subsequently decided to continue minor construction at Watten "for deception purposes". The site itself was now useless, as the Germans recognised when they wryly codenamed it Concrete Lump. The Watten site was captured on 4 September 1944 by Canadian forces. The Germans had evacuated it a few days earlier and removed the pumps which kept the cavernous basement free from water; not long afterwards it began to flood. This made a substantial amount of the bunker inaccessible to the Allies. Air raids ==Subsequent investigations and utilisation==
Subsequent investigations and utilisation
The bunker was inspected on 10 September 1944 by the French atomic scientist Frédéric Joliot-Curie, accompanied by Sandys. Despite the capture of Watten, it was still not known at this time what the site had been intended for. Sanders noted that "the purpose of the structures was never known throughout the period of intensive reconnaissance and attack". Based on the discovery of large aluminium tanks installed in the main part of the bunker, he opined that the Germans had intended to use it as a factory for the production of hydrogen peroxide for use in the fuelling of V-1 and V-2 missiles. He ruled out the possibility that it could have been used for LOX production and concluded, erroneously, that "the site had no offensive role." He recommended that (unlike the Mimoyecques and Wizernes sites) the Watten bunker presented no threat to the UK's security and "there is thus no imperative need, on that account, to ensure the destruction of the workings." The bunker was targeted again by the Allies in February 1945, this time to test the newly developed CP/RA Disney bomb – a concrete-piercing rocket-assisted bomb designed to double the normal impact velocity, and thereby increase the penetration, of the projectile. The site had been chosen for testing purposes in October 1944 as it had the largest accessible interior area of the targets under consideration and was furthest from an inhabited town. On 3 February 1945, a B-17 of the US Eighth Air Force dropped a Disney bomb on the Watten bunker and scored a hit over the wall section, but the results were inconclusive and the Air Force was not able to determine how well the bomb had penetrated the concrete. Although Disney bombs were used operationally on a number of occasions, the weapon's introduction came too late to be of any significance in the war effort. In January 2009 the body of the Disney bomb was extracted from the roof, where it had embedded itself. ==Preservation==
Preservation
The Watten bunker was inspected again on 20 June 1951 by an Anglo-French commission to determine whether it was capable of being reused for military purposes. The British Assistant Military Attaché, Major W.C. Morgan, reported to the Director of Military Intelligence at the War Office that the main part of the bunker had not been significantly damaged by bombing and that although it was flooded, if it was patched and drained "the building could be quickly made ready to receive oxygen liquifying plant machinery, or for any other purpose requiring a large and practically bomb-proof building." No further military use was made of the bunker and the land on which it stands reverted to private ownership. It was left abandoned for many years before the owners decided to redevelop the site. In 1973, the bunker was opened to the public for the first time under the name of ''Le Blockhaus d'Éperlecques''. The ownership was taken over by Hubert de Mégille in the mid-1980s and on 3 September 1986 the French state declared it a . The area around the bunker has been re-forested, though it is still heavily scarred by bomb craters, and various items of Second World War military equipment (including a V-1 on a launch ramp) are on display alongside paths around the site. An open-air trail leads to and around the bunker with interpretative signs posted at various points to tell the story of the site and the German V-weapons programme. In 2009, the museum welcomed 45,000 visitors. ==See also==
tickerdossier.comtickerdossier.substack.com