The Carbon Canal is an irrigation canal in the central portion of Utah, United States. The canal was constructed by the Carbon Canal Company between 1907 and 1909 to provide water to agricultural fields west and south of the Price River.

Description
The Carbon Canal is a 28-mile long canal containing lined and unlined (i.e., earthen) sections. It begins at a weir on the Price River near the Spring Glen turn-off on U.S. Highway 6 and extends through Carbonville and the community of Price into Emery County to a point northeast of Elmo. It contains numerous flumes that carry the canal over rolling terrain. == History ==
History
From the beginning of Euro-American settlement in Carbon County, the Price River was one of a few perennial freshwater sources on which pioneers could rely. The river’s drainage was first permanently settled by Mormon pioneers in the late 1870s at Spring Glen. Within three years, other small settlements appeared at Carbonville, Price, Wellington, and Helper. With the exception of Helper, which was established to support trains making the climb over Soldier Summit, these communities depended on agriculture for basic subsistence. Thus, their dependence on freshwater sources—particularly the Price River—for more than culinary water was strong and deep. Crop production on the dry uplands was limited by a lack of facilities to carry water from the river. The first settlers reportedly carried water from the river in wooden barrels and tanks to their fields. This lasted until the settlers dug a series of small ditches to convey irrigation water to their fields. The ditches proved generally sufficient to serve the needs of the limited settler population until 1883, when the Denver & Rio Grande Western (D&RGW) Railroad was completed through Utah. The railroad passed through the Price River communities on its way north through Spanish Fork Canyon and on to the Wasatch Front. The completion of the railroad transformed the communities from isolated farm towns to a booming railroad region almost overnight. The arrival of the railroad coincided with the discovery of vast coal reserves in the area, and within a few years, the communities of the Price River bustled with hundreds of miners, railroad men, and entrepreneurs, forever changing the sleepy Mormon bergs into Utah’s mecca of ethnic and religious diversity. The arrival of the railroad and mining industries saw a concurrent increase in the general settler population of the area as the economy grew sufficiently to allow for a community of supporting commercial enterprises. Most settlers not directly involved in the mining and railroading industries as laborers at least supplemented their household economy with agricultural pursuits if not relying entirely upon them. As the population grew and the demand for irrigation water increased, early ditches reached the limits of their capacity. It soon became clear to area farmers that a more extensive system was needed. The first large-scale effort to develop an irrigation system occurred in the late 1880s, when the newly formed Price Water Company completed what became known as the Price Canal. The canal, which was fed by a diversion on the Price River near the Spring Glen turn-off on SR-6, was completed in 1888. The canal—still in use today—carries water east and north of the Price River, skirting the northern and eastern parts of the Price community and ending several miles east of Wellington. Initial construction As the new century of the 1900s dawned, area farmers had reached a tipping point—either acquire more water or forever limit agricultural production. By 1906, several representatives of the community joined together to incorporate the Carbon Canal Company (known over the years by other names). In August of that year, the company, represented by R. W. Crocket, applied to the State of Utah for water rights on the Price River for the purpose of constructing a canal that would carry irrigation water to lands west and south of Price and lands south of Wellington and the river. The water right was granted on August 30, 1906 and received final approval in March 1907. The Certificate of Water Rights allocated 125 cubic feet per second (cfs) of Price River water to the Carbon Canal Company. According to the certificate, the diverting works on the river were to comprise “a concrete diversion dam … and a canal measuring 149,737 ft. long, 5 to 18 ft. wide on top, 4 to 12 ft. wide in the bottom, having an effective depth from 2 to 6 ft.” The length of the canal would carry it through the southern part of Carbon County and into the now-abandoned northern Emery County town of Victor. The diversion dam was to be located roughly 4 miles north of Price. The water right granted to the Carbon Canal Company provided for agricultural water use through the system between April 1 and September 30 each year “to irrigate 7,973.46 acres of land…” The newspaper noted that numerous construction camps had been established along the proposed route of the canal and 100 men and 60 livestock teams were on-site. Lumber and cement were reportedly being brought in by rail to Helper and then transported to the work sites, presumably by wagon teams or truck teams. No other information could be found regarding the initial construction of the canal. The canal was completed in 1909 and included six wooden flumes—Gordon Creek, Garley Wash, Pinnacle Wash, Drunkard’s Wash, Miller Creek, and Olsen’s Wash—and a 280-foot tunnel. The flume at Olsen’s Wash was later replaced with an undershoot. Expanding the irrigation network Farmers in the area then constructed a network of smaller ditches to carry water from the canal to their agricultural lands, including fields south of the Price River. Shortly thereafter, several farmers in Sanpete County acquired the reservoir company’s water rights to allow them to divert water to their lands. In 1902, they sold their water rights to the Irrigated Lands Company, which began construction of the Mammoth Dam in 1907. Additional work to be conducted under the loan included “tearing out the sluice gate at what is known as Sand wash” and replacing it with a series of dykes and iron pipes. The dispute between the canal company, the state land board, and the state engineer roiled for nearly two months, as the canal company proceeded with repairs according to their own plans—ignoring those of the state engineer—and the state engineer condemning the work. State Engineer Bacon contended the work done by the canal company violated the terms of the loan agreement and jeopardized the ability of the canal to provide irrigators with reliable water in the upcoming irrigation season. The canal company board agreed not to interfere with Bacon as the work progressed, and all foremen of work crews were directed to take “orders only from the state engineer.” Financial challenges continued to plague the canal company. Flooding in August 1927 caused severe damage to many of the flumes and other structures along the canal. Lacking sufficient in-house funds for the repair work, the company sought another loan from the state land board—this time for $51,000. The Salt Lake Telegram reported that the state was willing to authorize the loan, adding it to an existing $67,000 debt owed by the canal company on prior loans so long as an existing second mortgage held by the Utah Savings and Trust Company was paid first. The loan reportedly brought the total debt owed to the land board by the canal company to $118,000 (the equivalent of approximately $1.65 million in 2017). Great Depression and World War II development The Great Depression started the year after the flood repairs, and a severe drought gripped Utah beginning in 1931. Across the state, low crop yields, coupled with weak markets, led many water users to default on their payments to canal companies. The Carbon Canal Company appears to have struggled with their continued financial woes, and the State of Utah assumed ownership of the Carbon Canal assets in early 1932 due to the outstanding debt of the canal company. A 1934 Salt Lake Telegram article refers to the canal as the “state controlled Carbon canal (sic)” and notes that the canal company still owes the state $65,000. The project was expected to cost $6,000, but the contribution of labor by the Soil Conservation Service (the modern predecessor to the Natural Resources Conservation Service) reduced the anticipated cost to users to approximately half that amount. Upstream from the canal, much activity was underway during the 1940s to address the challenges at the Scofield Dam. As noted above, the dam had started to deteriorate significantly during the late 1920s. The outlet tunnel had failed numerous times, and an embankment was eroding away. On May 21, 1928, a beaver tunneling into the dam nearly caused the entire dam to fail. In 1957, the canal company borrowed $4,000 (at 7% interest) from the Carbon Emery Bank of Price to pay for raising the flume and replacing the abutments where the Carbon Canal crosses Pinnacle Wash. The debt was to be repaid by November 1 of the following year. In 1966, the canal company board introduced a resolution to borrow additional funds to partner with the Carbon Country Club to enlarge and re-align the course of the Price River directly below the diversion point of the Price Canal to address anticipated flood damage to the Carbon Canal diverting works a short distance downstream. It is unclear if that work was ever completed. Two years later, in 1968, the flume at Drunkard’s Wash was lined with fiberglass to prevent water leakage and address other damage, some of which was apparently caused by the use of the flume as a swimming location by local youth. Operations during the 1950s included at least two water use agreements entered into by the Carbon Canal Company to supply a portion of its allocated water rights in the Price River to other parties. Specifically, in 1956, the canal company entered into a water use agreement with Utah Power & Light (UP&L) to furnish water to UP&L’s power plant at Castle Gate (i.e., the Carbon Plant). The canal company was to provide up to 1600 acre feet of “direct flow of water” to the plant. The price per acre foot of water used by UP&L was set at $4.00. In December of the following year, 1957, the canal company entered into a short-term agreement with the Shell Oil Company to provide water from their canal to the oil company’s drilling operations in the “Miller Creek Area” until the start of the 1958 irrigation season. The oil company was to receive 1 acre foot of water per day for the daily rate of $20.00. A few years later, in 1965, the Carbon Canal Company filed a lawsuit against the Cottonwood–Gooseberry Irrigation Company and others over water rights to the Price River drainage. This case, as with the 1960 court decision, did not turn out in favor of the canal company. In a 1967 Utah Supreme Court decision on cases of the Carbon Canal Company and the Price River Water Improvement District (PRWID) against the SPWUA, the court found in favor of the canal company that their water right claim of 1937 had priority over a 1924 claim by the SPWUA because the SPWUA had missed deadlines for filing their claim and making subsequent filings. Unfortunately for the Carbon Canal Company, the litigation over the Gooseberry Project continued well into the modern era. Throughout its history, the Carbon Canal has been a vital component of rural agricultural life in Carbon County. To some, the canal is nothing more than a simple ditch in the ground. But to many, its trenches and dugways, its flumes and diversions, are a constant reminder of tremendous effort of the settlers of the early 1900s to bring water to the dry lands of the area and sustain an agricultural way of life for generations to come. The canal remains in use today, continuing its more than 100-year-old job of delivering water to a parched land. Modern era Over its long history, the Carbon Canal has quietly and consistently done its job with the help of Carbon Canal Company, which maintains and repairs the aging infrastructure. Periodic flood events, particularly flash floods, have taken their toll on the canal and often overwhelm the diversion structure on the Price River. To address this issue, the canal company, in cooperation with the Natural Resources Conservation Service, is embarking upon an effort to repair and replace the diversion dam and intake structure at the headwaters of the Carbon Canal. This effort, which should be completed in 2018, will leave portions of the original dam in place. These remains will stand as a reminder to future generations of the efforts of early pioneers to harness the water of the Price River and create an agricultural industry in their Carbon County settlements. == References ==
tickerdossier.comtickerdossier.substack.com