Namo Bharat Rapid Rail RRTS Station Trainset For greater ease of transportation within the National Capital Region, India's first Regional Rapid Transit System (RRTS), called
Namo Bharat Rapid Rail and Vande Metro, with 8
semi-high speed rail corridors is being developed in phases in Delhi NCR: an implementation of plans made by
India's Planning Commission. The RapidX trains will have a maximum trial speed of 180 km/h (110 mph) and a maximum operational speed of 160 km/h (99 mph). • Phase-1: First phase has the following 3 priority corridors: •
Delhi-Meerut RRTS: It is an 82.15 km (51.05 mi) long line, India's first RRTS, which will be fully completed by 2025. •
Delhi-Panipat-Karnal: expanded to total 136.30 km length from Delhi to Karnal (from original 103 km to Panipat) with 21 stations at a cost of Rs 33,051.15 crore, DPR is complete and under review by the central government, Ashok Agarwal, national president, Indian Industries Association (IIA), said "We have also received queries related to the allotment of land along the Ganga Expressway from investors. Most of the queries are for land in
Meerut,
Budaun and its adjoining areas". • Meerut along Delhi Meerut Expressway • Dadri Noida Ghaziabad Investment Region
Proposed Orbital Rail Corridor (ORC) A total of three orbital rail corridors of proposed connected important districts of
Meerut,
Palwal,
Sonipat,
Noida,
Gurugram,
Faridabad and covering NCR area in circular fashion by rails for passenger trains and goods. •
ORC - I: Haryana developing ORC by 2025 connecting Palwal-Sonipat. Uttar Pradesh is also planning to develop ORC connecting Palwal - Khurja - Meerut - Bagapat - Sonipat, to complete the Orbital Circle 1. This is expected to be made fully operational by 2028. •
ORC - II: As "Regional Orbital Rail Corridor (RORC)" connecting Panipat- Shamli- Meerut- Jewar- Nuh- Bhiwadi- Rewari- Jhajjar- Rohtak- Panipat (along CREII) to enable fast regional movement of passenger and goods avoiding CNCR area. •
ORC - III: As "Outer Orbital Rail Corridor (OORC)" along CRE-III, is planned by 2041.
Railways It is also proposed in Regional Plan 2041, Delhi NCR that all railway lines in NCR should be 4 tracks by 2030 and 06 tracks by 2040, 100% electrified, broad gauge and of high speed, with latest safety systems, Train Autonomous Cicrumambutation System (TACS), Centralised Traffic Control (CTC), etc.
Airports Currently there is only one international airport, which is
Indira Gandhi Internal Airport Delhi. Another airport,
Jewar Airport Noida which could become one of Asia's largest airports once full operational is expected to be completed in 2025. Another airport in
Dr. Bhimrao Ambedkar Meerut Airport is proposed in Regional Plan 2041, Delhi NCR. ==Central National Capital Region==