An MPAN is commonly separated into two sections: the core and the top line data. The core is the final 13 digits and is the unique identifier. The top line data gives information about the characteristics of the supply and is the responsibility of the supplier. The full MPAN is required to be depicted on electricity bills (the boxes on the top and bottom line are generally unaligned). The core data is on the second line, with supplementary data on the first line. Only the last digit on the bottom row is the check digit.
Profile Class (PC) The first two digits of a full MPAN reflect its profile class. Profile class 00 supplies are half-hourly (HH) metered, i.e. they record electricity consumption for every half hour of every day, and supplies of the other profile classes are non-half-hourly (NHH) metered. A NHH supply must be upgraded to HH where: Half-hourly data is recorded by the meter and collected by an onsite download, or by remote communication methods such as
GSM,
SMS,
GPRS or telephone line.: Continue as currently for MPANs with a Profile Class of ‘02’ or ‘04’ or populate with ‘00’ for any MPANs that do not have a Profile Class
Meter Time Switch Code (MTC) The MTC is a three-digit code that reflects the various registers a meter may have, such as a single rate, day/night split, or a seasonal time of day. When the Metering System is migrated into the Marketwide Half-Hourly Settlement (MHHS) arrangements, the following applies: Populate from the SSC Id valid set for Traditional Meters or Populate with ‘0000’ for any MPANs for which the SSC Id is not applicable
Line Loss Factor Class (LLFC) The Line Loss Factor Class or LLFC is an alphanumeric code used to identify the related
Distribution Use of System (DUoS) charges for the MPAN. The figure reflects both the amount of distribution infrastructure used to supply the exit point and the amount of energy lost through heating of cables, transformers, etc. They effectively carry electricity from the
National Grid to the exit points (each having a unique MPAN and a possibility of several meters) where the customers are. The owner of the distribution network charges electricity suppliers for carrying the electricity in their network. Their DNO licensed regions are the same geographic areas as the former
nationalised electricity boards. == MPAN state ==