First Avenue Subway mezzanine There is another, unfinished mezzanine on the east side of First Avenue. This second mezzanine is accessible only through now-blocked passages past the east end of the platforms. This mezzanine was built to address a subway down First Avenue, if one were to be built.
Express tracks East of the station, the center tracks continue disused along Houston, but rise to an upper level and stub-end near
Avenue A at
bumper blocks. Near the end, these tail tracks begin to separate to create a provision for a center track which only extends about 10 or 15 feet and stops at the bulkhead at the end of the tunnel. It was planned that these tracks would continue under the
East River to the
South Fourth Street Line, part of a never-built system expansion. The area was cleared out in 1990, and corrugated metal walls with
bumper blocks were installed just past the east end of the platforms to seal the tunnels.
Second Avenue Subway service As part of the
1929 IND Second System, the
unbuilt plans for the
Second Avenue Subway called for the new line to run directly above the existing Second Avenue station. Room was left for the anticipated four-track right-of-way above the Sixth Avenue trackways and directly east of the entrance at Second Avenue; on the west end of the platforms, the ceiling drops. Above this lower ceiling is an empty space that can fit either four trackways, two side platforms, and one island platform (similar to
34th Street–Penn Station on the IND Eighth Avenue Line) or two trackways and two side platforms. The trackways can be made out from the ceiling pattern from the active platforms. The mezzanine at Second Avenue, possibly intended as temporary, has doors that lead to the unused track space. Crew rooms were built on most of the space prior to the introduction of the V. As part of the 21st-century
construction of the Second Avenue Subway, a new
Houston Street station will instead be built below the existing one, with a free transfer between them. The decision to use a deeper alignment under Chrystie Street was made to simplify construction and lessen impact to the community. Second Avenue service would be tentatively provided by the
T train once Phase 3 of construction is complete. When this happens, the station would become a terminal station for southbound service. There will be a double crossover north of the station. In addition to the current entrances, the Second Avenue Subway station will utilize a new entrance to be constructed at Second Avenue and Third Street. In accordance with the
Americans with Disabilities Act of 1990, the Second Avenue Subway platform will be wheelchair-accessible; however, it is unknown if the Sixth Avenue Line platforms will also become accessible. ==Notes==