MarketIstanbul Airport
Company Profile

Istanbul Airport

Istanbul Airport is the larger of two international airports serving Istanbul, Turkey. It is located in the Arnavutköy district on the European side of the city. It is the largest airport in Turkey, the largest privately-owned airport operation in the world, and the second busiest airport in Europe.

History
Background Atatürk Airport was one of the busiest airports in Europe. Since 2013, it had ranked among the five busiest airports in Europe by passenger traffic. In 2017, Atatürk Airport and Sabiha Gökçen, Istanbul's other international airport, handled over 100 million passengers combined. By comparison, the six London-area airports serve more than 150 million passengers a year, while the three Paris-area airports serve around 100 million passengers a year. As Atatürk Airport was hemmed in by the city on three sides and the sea of Marmara on another, it was unable to expand to meet the growing demands placed on it. Sabiha Gökçen was also at capacity. The decision was taken to build a new airport, well away from the city to ensure ample space. Location It was decided to construct the new airport at the intersection of roads to Arnavutköy, Göktürk, and Çatalca, north of central Istanbul and between the Black Sea coast towns of , Tayakadın and Akpınar. The area is a region near Lake Terkos. Some of this area was state-owned forest. The distance between Istanbul Airport and Atatürk Airport is approximately . The area encompassed old open-pit coal mines, which were later filled with soil. According to the Environmental Impact Assessment (ÇED) report published in April 2013, there were a total of 2,513,341 trees in the area and 657,950 of them would need to be cut indispensably, while 1,855,391 trees would be moved to new places. However, the Ministry of Forest and Water Management claimed the exact number of trees cut and moved would only be revealed after construction was complete. The project was achieved by an international design team working across different phases, but all focused on the collective vision. The architects behind the concept design were Grimshaw Architects, Nordic Office of Architecture and Haptic Architects. The lead delivery architect was Scott Brownrigg, also in charge of the interior concept design with IGA Design. Local delivery architects were Fonksiyon Mimarlik, Turgut Alton Mimarlik and Kiklop Design & Engineering. though construction only started in May 2015 after the land was officially handed over. The inauguration of the airport took place on the planned date of 29 October 2018. It was reported that the first test landing at the airport would take place on 26 February 2018; however, the first landing took place on 20 June 2018. Testing of navigational and electronic systems with DHMİ aircraft had begun on 15 May 2018. The control tower is in the shape of the Turkish national flower, the tulip. Project stages The construction of the airport is taking place in several stages, expanding the airport and its facilities over time. The first stage consists of the main terminal, with an annual passenger capacity of 90 million and an area of — making it the world's third-largest airport terminal building. There will also be two pairs of parallel runways connected to eight parallel taxiways to the west of the main terminal, approximately of apron space, and an indoor car-park with a capacity of 12,000 vehicles. In addition, the airport will feature three technical blocks for repairs, maintenance, and fueling, as well as an air traffic control tower, eight ramp control towers, and hangars for cargo and general aviation aircraft. Several other services are also to be in operation, including hospitals, frequent-flyer and VIP lounges, prayer rooms, convention centers, and hotels; some of these are expected to form part of the Istanbul Airport City project. The second stage will add a third independent runway to the east of the main terminal, as well as a fourth remote runway with an east–west heading and additional taxiways and apron areas. The third stage is planned to add a second passenger terminal with a capacity of 60 million annual passengers and an estimated area of around , as well as an additional runway and new support facilities area. The fourth and final stage of expansion will, along with adding another runway, allow for the construction of satellite terminals with a combined capacity of 50 million passengers and an area of up to if needed. If fully expanded to a capacity of 200 million, the airport will exhibit four terminal buildings with interconnecting rail access that combine for a total indoor area of . The airport will also have a apron with a parking capacity of 500 aircraft, VIP lounges, cargo and general aviation facilities, a state palace, and indoor and outdoor parking that can accommodate up to 70,000 cars. A medical center, aircraft rescue and firefighting stations, hotels, convention centers, power plants, and wastewater treatment facilities will also be built. Controversies The Turkish Chamber of Environmental Engineers (ÇMO) took the project tender to court on the grounds that the project violated the existing legislation for the preparation of the Environmental impact assessment (ÇED) report. However, the groundbreaking ceremony still took place a few months later, on 7 June 2014. Turkish daily Evrensel also alleged that fatal accidents continued to occur. In October 2019, UK publications Construction News and ''Architects' Journal'' published a joint investigation into fatalities at the airport, nicknamed by workers "the cemetery" as so many have died. By this point, the official death toll had risen to 55, but unofficial estimates suggested that the figure could be "higher than 400". Mass worker protests broke out on 14 September 2018 after a bus carrying workers crashed, injuring 17. Complaints by workers included poor living conditions in "vermin-infested dormitories", issues in transportation that had left them stranded under the rain or on-site during holidays, and long delays in payments, among others. Operations The opening ceremony took place on 29 October 2018, scheduled so as to coincide with the 95th anniversary of the proclamation of the Turkish Republic. The airport had been unofficially known as 'Istanbul New Airport' during construction – the new official name of 'Istanbul Airport' was announced at the opening ceremony. The first flight from the airport was Turkish Airlines flight TK2124 to the Turkish capital Ankara on 31 October 2018. On 1 November 2018, five daily flights began to arrive and depart from the airport: from Ankara, Antalya, Baku, North Nicosia, and İzmir, followed by Adana and Trabzon starting in December. Before the full transfer, all flights were operated exclusively by Turkish Airlines. Regularly scheduled flights to all of the new airport's destinations continued to depart from Atatürk and Sabiha Gökçen airports alongside these trial flights. It was originally planned that on 31 December 2018, all equipment from Atatürk Airport would be transferred to the new airport via the O-7 motorway. As of 17 January 2019, the transfer phase was set to start 1 March 2019. However, on 25 February, the transfer phase was moved a fourth time to 5 April 2019. The full transfer of all scheduled commercial passenger flights from Atatürk Airport to the new Istanbul Airport took place on 6 April 2019 between 02:00 and 14:00. Hundreds of trucks carried more than 10,000 pieces of equipment, each weighing about 44 tons were moved to the new airport over 41 hours. Atatürk Airport's IATA code IST was swapped with Istanbul Airport's previous code of ISL. In February 2022, Turkish Cargo relocated all cargo flights and operations from their former base at Atatürk Airport to the new airport. == Facilities ==
Facilities
Runways The airport currently has one terminal in service for domestic and international flights and five runways (three main and two backups) that are currently in operation. The two 17/35 runways are both long, while the 16/34 runways are both long. Runway 18/36 is long, shorter than the other runways, although it is projected to expand to , the same length as the 16/34 pair. Runways 17L/35R and 16R/34L are wide, while 17R/35L, 16L/34R and 18/36 are wide. All runway surfaces are asphalt. Concourses The airport features a total of five concourses, lettered A, B, D, F, and G, with a total of 143 passenger boarding bridges. Concourse G, which is located in the southeast, is reserved solely for domestic flights. Concourses A, B, D, and F are used for international flights. The C and E concourses connect directly to the main terminal and are therefore not independent concourses. Security 3,500 security personnel and a total of 1,850 police, including 750 immigration officers, provide the airport's security. The site's perimeter is protected using ground radar, fixed CCTV cameras every 60 meters, pan–tilt–zoom cameras every , thermal cameras and fiber optic sensors every . The active terminal building uses up to 9,000 CCTV cameras. Mosque Ali Kuşçu Mosque, which lies within Airport City to the south of the airport and can accommodate up to 6,000 worshippers, has become the world's first "LEED Gold" certified mosque registered with the U.S. Green Building Council. ==Airlines and destinations==
Statistics
Below is the passenger data and development for Istanbul Airport for the years 2018–2026: ==Environmental impact==
Environmental impact
The airport is estimated by Climate Trace to have emitted 9.5 million tonnes of CO2 in 2023, making it the country's second largest greenhouse gas emitter. ==Ground transport==
Ground transport
Metro The M11 metro line opened on 22 January 2023, originally going to Kağıthane. With the Gayrettepe extension of the line being put into service on 29 January 2024, trains run eastward to Gayrettepe and westward to Arnavutköy. An extension to Halkalı is under construction. Bus The airport is serviced from the city by public IETT and Havaist buses. Car and taxi The airport is reachable by car from the O-7 motorway or D.020 highway. Istanbul city taxis are available 24 hours a day outside the arrival and departure areas of the airport. A trip to Istanbul city centre by taxi takes approximately an hour. Rail There are plans for mainline railway to connect the airport to Çatalca and Halkalı, and via outer city bypass running over the Yavuz Sultan Selim Bridge across the Bosporus and connecting with the Anatolian rail network at Gebze but construction has been continuously delayed. ==See also==
tickerdossier.comtickerdossier.substack.com