Railway station (1860-1958) The
Harcourt Street railway line was built by the
Dublin, Wicklow and Wexford Railway and opened in 1854, running from a temporary terminus at Harcourt Road near the city centre to
Bray. Milltown was added as an
infill station in 1860. The station was located on an embankment to the north of Milltown Road. The main station building was located on the up (Dublin-bound) platform. A footbridge allowed passengers to cross the tracks. A signal cabin existed on the down side, but this was closed in 1923 and demolished soon afterwards. To the south of the station, trains crossed the
River Dodder on the
Nine Arches Bridge, a stone viaduct built for the line.
Closure (1959-2004) The Harcourt Street line had declined in use throughout the early 20th century and was closed by
CIÉ at the end of 1958, despite local opposition. The tracks were lifted soon after and all stations on the route were auctioned off. In the years that followed, the buildings and platforms at Milltown were demolished.
Luas (2004-present) Construction of the first phase of the Luas system commenced in 2001 and concluded in 2004. The route chosen for the Green Line re-used the old Harcourt Street alignment between
Charlemont and
Stillorgan. By this stage, little of the old Milltown station remained, but a Luas stop of the same name was built in the same place; The retaining wall at the edge of the southbound platform is the only feature retained from the original station. However, the adjacent viaduct was in good enough condition to be re-used. The viaduct was renovated, hand new track laid on it, and was fitted with
parapets and poles to support the catenary wires. Milltown Luas stop has simple edge platforms with signage, ticket machines, displays and shelters. Directly to the north is a level crossing which provides access to a nearby college. The old station had a level crossing in much the same place. In 2018, the platforms were lengthened from 45 to 55 metres. This was to accommodate the new longer trams introduced to boost capacity.
Service Trams run every 5–10 minutes and terminate at either
Parnell or
Broombridge in the north, and
Sandyford or
Brides Glen in the south. == Onward transport ==