Early developments within Assam The Assam Railway and Trading Company played a pioneering role in laying railway tracks in Assam. The Assam Railway and Trading Company Limited was incorporated in 1881. The first metre-gauge locomotive was put into service in Assam in 1882. The 64-kilometre (40 mi)-long line from Dibrugarh steamer ghat to Makum was opened to passenger traffic on 16 July 1883. The objective of opening an isolated railway in upper Assam was to link the tea gardens and coalfields to the steamer ghats. In the latter part of the 19th century, the Dibru–Sadiya railway was 149-kilometre (93 mi) long.The 1,000 mm (3 ft 3+3⁄8 in)-wide metre-gauge railway track earlier laid by Assam Bengal Railway from Chittagong to Lumding was extended to Tinsukia on the Dibru–Sadiya line in 1903.
Assam links pre-independence During British rule, rail links from Assam to the rest of India were through the eastern part of Bengal. In pre-independence days, there were basically two linkages. On the western side, a metre gauge line running via
Radhikapur,
Biral,
Parbatipur, Tista,
Gitaldaha and
Golokganj connected
Fakiragram in Assam with
Katihar in Bihar. On the eastern side, Assam was linked to
Chittagong through the
Akhaura–Kulaura–Chhatak line and
Akhaura–Laksam–Chittagong line. Assam was linked to numerous other towns in the eastern part of Bengal through what is now the
Mahisasan-Shahbajpur defunct transit point. The eastern line had been constructed in response to the demand of the Assam tea planters for a railway link to
Chittagong port.
Assam Bengal Railway started construction of a railway track on the eastern side of
Bengal in 1891. A track between
Chittagong and
Comilla was opened to traffic in 1895. The Comilla-Akhaura-Kulaura-Badarpur section was opened in 1896-1898 and finally extended to
Lumding in 1903. The Assam Bengal Railway constructed a branch line to Guwahati, connecting the city to the eastern line in 1900. Apart from the eastern and western lines, there was another link. In 1908,
Eastern Bengal Railway extended the Kaunia–Dharlla line to Amingaon. During the 1900–1910 period, the Eastern Bengal Railway built the Golakganj-Amingaon branch line, thus connecting the western bank of the Brahmaputra to the western line. In 1904, The Mariani–Furkating line wa made & it was operated by Jorhat-Provincial Railway. In 1937, the British also planned Guwahati-Dhaka line in Meter Gauge which was slated to connect Guwahati with Dewanganj Upazila(Bangladesh) as Dewangaunge was already connected with Dhaka via Mymensingh by a 259-kilometre (161 mi) long Meter Gauge line. The 323-kilometre (201 mi) long Railway Guwahati-Dewanganj project was scrapped in 1943-1947 period owing to Second World War, Indian National Army defeating the British & partition of India.
Assam Link Project With the partition of India in 1947 & Independence, all the three links were lost and for a short period the railway system in Assam was delinked from the rest of India. Indian Railways took up the Assam Link Project in 1948 to build a rail link between
Fakiragram and
Kishanganj. Assam was connected with India through the newly laid Kishanganj-Fakirgram Railway line. The 300.1 kilometres (186.5 mi) Meter Gauge line was completed in 1950 under General Karnail Singh & General Kodandera Subayya Thimayya (Gen. KS Thimayya) of Indian Army.. The New Bongaigaon–Guwahati section was converted to
broad gauge. Broad gauge reached Guwahati in 1984.
Saraighat Bridge The construction of the 1.49 km long
Saraighat Bridge, the first rail-cum-road bridge across the Brahmaputra, was an event of great excitement.
Jawaharlal Nehru, India’s first prime minister formally laid the foundation stone on 10 January 1960 and it was completed in 1962, connecting the two parts of the metre gauge railways in Assam.
Siliguri-Jogihopa-Kamakhya line The long
broad gauge Siliguri-Jogihopa line was constructed between 1963 and 1965. The
Naranarayan Setu was constructed in 1998, thereby paving the way for linking Jogihopa with Kamakhya.
Dudhnoi-Mendipathar branch line The line between
Dudhnoi in
Assam and Deepa in
Meghalaya was proposed in the Rail budget of 1992–93. Later the alignment was changed to
Dudhnoi-
Mendipathar in 2007 due to opposition of local people. Due to late handover of land to railways in Assam and Meghalaya, the progress of work was slow up to 2013. Acquisition of land was completed by March 2013. This rail line is the first foray of
Indian Railways into Meghalaya.
Mendipathar railway station was inaugurated by the
Prime minister of India,
Narendra Modi on 30 November 2014, through a video feed to the ceremony gathering at Mendipathar. ==Electrification==