Olkaria I Geothermal Power Station is one in a series of six geothermal power stations, clustered in the Olkaria area in Nakuru County. Four of the stations Olkaria I, Olkaria II, Olkaria III and
Olkaria IV were operational, as of September 2017. As of 2020, the entire Olkaria complex had an installed capacity of 810.3 MW
Olkaria V was synchronised to the grid in 2019. and
Olkaria VI is planned for 2021. ==History==