Surabaya Pasarturi Station has eight railway tracks. Initially, track 2 was a straight track from and to Jakarta and Semarang, while track 3 was a main track to and from / and . After the
double track on the segment from this station to was officially in operation on 3 September 2014, track 2 is currently a double track straight line from Jakarta-Semarang and track 3 is a double track straight line towards Semarang-Jakarta. Since July 2014, the mechanical signaling system at the station has been replaced with an electric one made by PT Len Industri. In 2019, the side platform of the station was extended and a canopy was added to support longer passenger trains. The station is part of the
rail wye used to turn locomotives; only used if the
turntables in the locomotive depot are not functioning. Apart from serving long-distance trains and local trains, Surabaya Pasar Turi Station is also used as a parking yard for the Jayakarta train, which was originally parked at
Surabaya Kota Station. == Services ==