Roxtec's work in the power transmission sector covers nuclear,
renewable energy,
clean fuels and
transmission and distribution.
Renewable energy Roxtec has worked on more than 40
offshore windfarms in Europe. Roxtec seals are utilised in a number of areas including cables in the generator system, the switch room, the converter, the tower, the nacelle, the transition pieces, the control cabinets, power converter cabinets, davit cranes, onshore grid substations and offshore converter stations. Roxtec worked with
Siemens Transmission and Distribution Ltd, which supplied and installed the two offshore substations for the first 630MW phase of
London Array and it supplied cable sealing products on the
Greater Gabbard wind farm off the Suffolk coast.
Nuclear Roxtec seals are used to seal cables and utility systems in new and decommissioned nuclear power generation plants, research facilities and military establishments.
Transmission and distribution Roxtec's work in the power transmission and distribution sector involves substations and Interconnector projects. Roxtec is used to seal power cables in the cable trench. Roxtec seals and protects the substation against water ingress. Flooded cable trenches were identified in a white paper by
EA Technology as a major cause of substation failure. Roxtec supplied
Western Power Distribution, the electricity
distribution network operator for the Midlands, South Wales and the South West, supplying over 7.7 million customers. ==Marine==