Campo Road SR 94 was built along the routing of an old
stagecoach road that was part of the primary road from San Diego to
Yuma, Arizona. A trip to
East County in the 19th century along the road would last two days. James Pascoe surveyed the route through Campo for the county in 1869 that was shorter than the existing route through Warner's Pass. The road was known for its curves, climbs, and boulders, making travel difficult. The first automobile went on the road in 1904. By 1913, an unpaved automobile road extended to Campo from San Diego, and work took place to improve the condition of the road in 1916. A year later, the road continued east to join with the state highway leading into
Imperial County. In 1927, the Potrero bridge was replaced, after a storm washed it out. By 1928, the paving of the Campo road was about 43 percent complete. In February of the next year, the progress was at 74 percent; the total cost was $122,474 (about $ in dollars). The Sweetwater bridge was finished in March at a cost of $60,000 (about $ in dollars). The Campo road was the only road through the
Peninsular Ranges to stay open for the entirety of the next winter; other roads were closed by snow, leading to increased traffic along this road. This was largely due to the lower elevation of the road, at only .
Designation and initial construction In 1931, the County Board of Supervisors agreed to submit the Campo road for consideration as a secondary state highway. The state considered the inclusion of the Campo road into the system in 1932. The
California State Legislature defined Route 200 in 1933 as a route from San Diego to west of Jacumba, going through the town of Campo. The San Diego Chamber of Commerce sent a representative to ask the state for funding for paving the Campo highway in 1935, and the road was paved that year. The Chamber also asked for the war department to declare the road a military highway to receive federal assistance for its improvement. Signs were posted for SR 94 in 1937, and by 1938, SR 94 was signed along Broadway and Lemon Grove Boulevard (later Federal Boulevard) before continuing east to Campo. The next year, the California Highway Commission declined to have the Campo road improved. However, the Highway 94 association, as well as the Campo-Potrero and Highway 80 chambers of commerce raised concerns about the safety of the children going to school in the buses along the road. In 1952, the Southern California committee of the state Chamber of Commerce recommended to the California Highway Commission that Route 94 be widened to four lanes from the
Wabash Freeway to Jamacha. In June 1953, the Commission approved an eight-lane freeway for Route 94 from Home Avenue in San Diego to Palm Avenue around La Mesa. The local Board of Education also gave their approval, which was required because the freeway would be built on land that was for a proposed school. But the next month, State Senator
Fred Kraft criticized the proposal because he believed that it would be too expensive and would not reduce congestion in the long term. Approval extended to the junction with US 80 by October 1953; the part from 18th Street to Wabash Boulevard followed in November 1954. Later that year, a toll road that would have tunneled under the
Laguna Mountains and bypassed Route 94 was proposed by the county Board of Supervisors. The state allocated $3.48 million (about $ in dollars) for making SR 94 a freeway from College Avenue to Campo Road in October 1954. Construction began on the first part of the SR 94 freeway just west of Lemon Grove by May 1955. The contract for the College Avenue to Campo Road portion was given out in October, for $2.9 million (about $ in dollars). Preparation for bidding on the portion from the Wabash Freeway to near Euclid Avenue took place towards the end of the year; construction was underway by May 1956, as was planning for the portion west of there to the intersection of 18th and F streets and the future interchange with
US 101 (Now I-5). The San Diego City Council requested that an overpass be constructed at 22nd Street to provide improved access; an underpass for the road was eventually built. At one point in 1958, SR 94 was considered as a possible extension of
US 90, a route proposed to run along the southern border of the United States to
Florida, by the South Bay Highway Association. By August, SR 94 from Palm Avenue to Jamacha was being planned. The western end of SR 94 connecting to US 101 was put up for the bidding process in late 1958. Construction on the interchange with US 101 began in 1961. By January 1962, the freeway was mostly complete west of La Mesa and the freeway connection to US 80. The part of the freeway from 25th to 17th streets was completed in November. In the
1964 state highway renumbering, SR 94 was officially designated from I-5 to I-8 near Jacumba, and SR 125 was designated from SR 94 near La Mesa north to
SR 56.
Expansion and naming Land acquisition for the construction of the SR 94 freeway through Spring Valley had begun by 1965. The next year, a plan to reroute and widen portions of SR 94 from the Sweetwater River to I-8 was underway, with a Caltrans proposal to remove the "Frenchy's" or "Three Springs" curve. In March 1968, the San Diego Highway Development Association considered the construction of the freeway from SR 125 to Jamacha Junction a priority. The state announced in August that the Spring Valley widening project would be funded earlier than anticipated, because of the state of the economy. Meanwhile, a $1.8 million (about $ in dollars) contract to widen SR 94 to eight lanes from Wabash Boulevard to Waite Drive in Lemon Grove was awarded in October. The freeway from Kenwood Drive to Avocado Boulevard in Spring Valley was completed in July 1970. An improved interchange with SR 125 was being planned in 1974, which would connect to the existing freeway extending to Avocado Boulevard. Construction began in October, and continued into late 1975, at a cost of $11 million (about $ in dollars); the road was predicted to reduce traffic at the intersection of Campo Road and Bancroft Drive, and interchanges at Spring Street and Lemon Grove Avenue were to be built. The Lemon Grove Avenue interchange was open by January 30, 1976, and parts of the interchange with Spring Street and SR 125 was open by July 20. By 1977, much of the SR 94 freeway was congested, with 85,000 to 95,000 trips per day on the freeway according to Caltrans. It was hoped that the construction of
SR 54 to the south and SR 125 would reduce traffic by 20,000 trips per day.
Onramp meters were installed in 1978 to throttle traffic entering the freeway with a centralized computer system; this resulted in reduced congestion on the freeway, according to motorists. In 1987, the bridge over the Sweetwater River that had been used for 58 years was replaced by a new bridge, at a cost of $2.3 million (about $ in dollars); construction had been delayed by nine months by concern over environmental harm to the
least Bell's vireo. The highway was designated the
Martin Luther King Jr. Freeway by the California State Legislature in September 1989, after a two-year struggle to find a suitable tribute to King in the
San Diego area. Nevertheless, the measure did not include funding for the signs, and as a result, they were not installed until 1998, when they were funded by the San Diego Association of Governments with $1.4 million (about $ in dollars) from a local sales tax. In 1995, a
U.S. Border Patrol checkpoint was opened near Dulzura, to combat human and drug trafficking that used SR 94, as well as fatal traffic accidents resulting from such smuggling. Two years later, following a proposal to widen SR 94 from Otay Lakes Road to SR 188 to address the high rate of accidents, local residents raised concerns about this proposal. In July 1998, the Back Country Coalition sued Caltrans concerning the short length of the
environmental impact report as well as not soliciting comments from the public; opponents pushed for a ban of all trucks on the highway. Caltrans agreed to hold another hearing in an out-of-court settlement, as well as to pay $20,000 for the attorneys. In March 1999, Caltrans agreed to delay the construction for several years to evaluate the environmental impact. During the early 2000s, the interchange with SR 125 was reconstructed to allow for the extension of the latter freeway south to SR 54, which was finished in 2003. In late 2006, the
Jamul Indian tribe prepared to construct a
casino, but many expressed concerns about the amount of traffic that would now travel on SR 94. In 2007, Caltrans declared that the construction required a permit to connect to SR 94 and to construct on the state
right-of-way. At the end of the year, the tribe had started construction on the driveway to the casino, while Caltrans stated that it lacked the information needed to determine if the proposed traffic signal should be approved. In late 2009, the tribe filed a lawsuit against Caltrans over the inability to get approval to connect the driveway with the highway. The tribe made the claim that they were a
sovereign nation and did not need the approval, but this was rejected by the court. Caltrans and the tribe came to an agreement in 2009, where the tribe would provide its own studies and pay for
environmental mitigation. ==Future==