MarketAhmedabad Bus Rapid Transit System
Company Profile

Ahmedabad Bus Rapid Transit System

Janmarg, also known as Ahmedabad BRTS, is a bus rapid transit system in Ahmedabad, Gujarat, India. It is operated by Ahmedabad Janmarg Limited, a subsidiary of Ahmedabad Municipal Corporation and others. It is designed by Centre for Environmental Planning and Technology at Ahmedabad. It was inaugurated in October 2009. The network expanded to 89 kilometres (55 mi) by December 2017 and 160 km by March 2023; with daily ridership of 349,000 passengers. BRTS won several awards in India and abroad for design, implementation and operation. It was rated Silver on BRT Standard in 2013.

History
Ahmedabad has a population of more than 6.3 million and an extended population of 7.2 million. It is the sixth largest city and seventh largest metropolitan area of India. The bus rapid transport system was created to serve a growing population. In 2005, feasibility study reports were prepared by the state project development agency, Gujarat Infrastructure Development Board, and later by CEPT University. The study was headed by H. M. Shivanand Swamy; an economist, urban planner and associate director of CEPT. The project was sanctioned by the Ministry of Urban Development under JNNURM program in 2005. CEPT designed the system after detailed analysis. Based on an analysis of the socio-economic factors, travel demand patterns, road network characteristics, the metro plan and the existing Ahmedabad Municipal Transport Service (AMTS) route network, a network of roads covering about 155 kilometres in length was identified for developing the BRTS. The second half of the first phase of the BRTS was inaugurated on 25 December 2009. It was extended to Kankaria Lake later, to cater to the eastern part of the city, and from Shivranjani to Iskcon Temple on 15 September 2012. On 28 September 2012, it expanded from Soni ni Chali to Odhav. The network expanded to 89 km by December 2015 at the total cost of 1200 crore. The third phase of the project includes the Shivranjani-APMC, Jashodanagar-Hathijan, Sola-Science City, Narol-Aslali and Akhbarnagar-Gota Crossroads stretches. It was approved in 2013 and is under construction. Dedicated buses for women were introduced in January 2016. In future, BRTS will be integrated with the Ahmedabad Metro, which is under construction. == Routes==
Routes
, following are the currently operational routes; 14 in both directions, 2 Shuttles (For Airport) and two in circular direction; serving 197 stops (includes 144 stations and 53 cabins at extended routes).