1984–2000 QatarEnergy LNG was established in 1984 as Qatargas (Qatargas Liquefied Gas Company Limited), a
joint venture between
QatarEnergy,
ExxonMobil and other partners. In the following years the company began developing the
North Field and erected the first three
LNG trains (Train 1, 2 and 3) with a design capacity of 3.3 million tonnes per year each. The trains were built in 1996, 1997 and 1998 respectively. The company executed the first two major sales and purchase agreements with eight Japanese customers in 1992 and 1994, the company
Chubu Electric Power being the largest. The contract guaranteed the delivery of 4 million tonnes of
LNG per year to Chubu Electric and six million tonnes per year over a 25-year period for the eight customers. The official foundation stone for Qatargas 1 was laid in 1994 and in 1995 another major contract with the
Korea Gas Corporation (KOGAS) was signed, guaranteeing the supply of 2.4 million tonnes of LNG per year. Also, in 1995, the first
offshore drilling operations were begun. In 2003, a joint venture for the Ras Laffan helium project was formed. It produced the first helium in August 2005. Qatargas 3 was formed in the same year between QatarEnergy and
ConocoPhillips. Another Head of Agreement between QatarEnergy and RL (II) to supply 15.6 Mta of LNG to the
USA was signed in 2003. RasGas also began to build and operate the first phase of the
Al Khaleej Gas project ("AK-1" or "AKG-1") for
domestic gas supply on behalf of QatarEnergy and ExxonMobil Middle East Gas Marketing. In 2004 the first dedicated LNG vessel
Fuwairit was delivered to RL (II), and in 2005 AK-1 was inaugurated and started, as well as Ras Laffan Liquefied Natural Gas Company Limited (III) (RLIII) established, which owns RasGas' trains 6 and 7, the company's first mega-trains. Another agreement between
Shell and Qatargas was made to erect Qatargas 4 ("QG4"). Qatargas Operating Company Limited was formed in July 2005 for the purpose of constructions of Qatargas 2, Qatargas 3, Qatargas 4, Laffan Refinery and other assets on behalf of the shareholders. In 2006 the construction for QG3 and QG4 started and RasGas' Train 5 was erected. The train was inaugurated in 2007 as well as the first Q-Max
LNG carrier "
Al Dafna" floated out of its
dry dock (delivered in 2009) and the first Q-Flex ship delivered to Qatargas. In 2008 two major SPAs were signed with
PetroChina, for 3 million tonnes per year over 25-years, and 2 million tonnes per year over 25 years with
China National Offshore Oil Corporation (CNOOC) with the deal totaling around 2 million tonnes per year. It was to begin in October 2009. Another 10-year contract was signed between Qatargas and TT, ordering 1 million tons of LNG a year, starting in 2011.
Ras Laffan Helium 1 reached its full production capacity in 2008 and the first LNG shipment to the west coast of
North America was completed. As well the first
Q-Flex vessel transited the
Suez Canal. Several other LNG deliveries to Italy (
Adriatic LNG), Mexico (
Altamira), China (CNOOC), Canada (
Canaport LNG), the United Kingdom (
South Hook) and the United States (
Golden Pass) followed in 2009 and new SPAs were signed, like the long-term SPA with
PGNiG of Poland. The SPA detailed 1 million tonnes per year over 20 years, with the first delivery being made in 2015. On April 6, 2009, the Qatargas 2 project was officially inaugurated with two mega trains of 7.8 million tonnes per year each. That same year phase 2 of the
Al Khaleej Gas project was launched. Following the
international economic crisis and the downturn of gas and oil prices in 2008, Qatargas temporarily had to declare
force majeure in January 2009 on production of three
LNG trains. The company remained on track with its other projects and its general direction. In November 2010 and January 2011, respectively, qatargas 3 and 4 started production. In December 2010, Qatar celebrated achieving the national goal of 77 million tonnes per year for the first time, making it the world's largest LNG producer. Because of the major advances in oil- and gas extracting techniques (
shale - or
tight gas from rock,
oil sands) Qatargas had to make adjustments in its corporate strategy. Whilst the company initially aimed at European customers and the United States, the increasing production from
North America made it necessary focus on
Asian markets, with Japan currently importing around 15% of its total gas consumption from Qatargas, and China, India and South Korea being other major customers. In 2010 the
Ras Laffan Helium 2 project was also announced, Train 6 began production (adding 7.8 million tonnes per year) and the
Laffan Refinery was inaugurated by Al-Thani. Another deal with Respol (Canada) was signed in the same year. Qatargas agreed to deliver the LNG to Canaport using both
Q-Flex and
Q-Max vessels, each holding the equivalent of approximately 5.6 and 4.6 billion
cubic feet of natural gas, respectively. Further major deliveries were made to Dubai and France and in 2010 further talks with the United Kingdom were initiated and a Heads on Agreement was signed. In June 2011 Qatargas then signed a three-year LNG deal with
Centrica (UK), valued at around $3.24 billion at the time. The contract has since then been extended to a four-and-a-half-year contract in June 2014 and the latest contract extending the partnership until December 2023. Centrica had originally tried to seal a 20-year contract. In 2010,
Sheikh Khalid Bin Khalifa Al Thani was appointed CEO for the new Qatargas.
2011–2020 Qatargas also signed a long-term agreement in 2011 for over 1 million tonnes per year with Malaysia's
Petronas, expiring in 2018, which has since been extended until December 2023. Qatargas' Train 7 began production in 2011 (7.8 million tonnes per year) and the
Map Ta Phut LNG Terminal was commissioned by Qatargas that same year. In the following year, 2012, Qatargas 1 signed a long-term contract with
Tokyo Electric Power Company for over 1 million tonnes per year of LNG. Qatargas 3 signed SPAs with PTT of Thailand, Japan's Kanasai and
Chubu Electric Power in 2012. In 2013 the Ras Laffan Helium 2 plant was inaugurated and produced its first
helium that same year. The plant is the largest of its kind in the world and made Qatar the world's largest helium exporter. In 2014 the construction for Laffan Refinery 2 began and the refinery delivered the first
Diesel Hydrotreater (DHT). The Procurement and Construction contract (EPC) for the DHT with
Samsung Engineering had been signed in 2012. The DHT is able to process per stream day of
ultra-low-sulfur diesel fuel and was operated at 50% capacity until the Laffan Refinery 2 began production in 2016. The first ship-to-ship transfer (STS) of LNG, following an incident with one of Qatargas' leased vessels in the straights of
Singapore, was carried out in 2014. Also, in 2014, Qatargas announced the successful start-up of the Jetty
Boil-off Gas Recovery Project, which aimed to reduce
flaring at the Ras Laffan LNG loading berths and was inaugurated in 2015. 2015 saw the 5000th LNG cargo loaded at
Ras Laffan Port, 2300 of them having been shipped to Japanese customers, as well as the sale of the first LNG to the
Kingdom of Jordan and the first delivery of LNG to
Pakistan State Oil Company made in 2016. The 10,000 LNG vessel was loaded at Ras Laffan Port in 2016 and the Laffan Refinery 2 started operations with a refining capacity of 146,000 barrels of
condensate per day. It was officially inaugurated by Al-Thani in 2017. In June 2017 Qatargas had to shut down operations of
Helium 1 and Helium 2, due to the economic boycott, which was imposed on Qatar by other
Arab States. Following other major companies like
ARAMCO, the preparation and integration of the merger of state-owned companies Qatargas and RasGas, which had been announced in December 2016, was completed in 2017. Qatargas delivered 1.5 million tonnes per year and signed a new SPA with Turkey's Boas, to deliver 1.5 million tonnes per year of
LNG for three years, beginning in October 2017. Another deal with
Royal Dutch Shell to deliver up to 1.1 million tonnes per year of LNG for five years was also signed as well. It aimed to "[…] create a truly unique global energy operator in terms of size, service and reliability" and to "[…] confirm and restrengthen QatarEnergy's superiority in the LNG business [by] reducing operating costs", stated the QatarEnergy's president and CEO
Saad al-Kaabi. The merger of Qatargas and RasGas became operative on 1 January 2018, marking the beginning for a "new" Qatargas and securing its rank as largest
LNG producer worldwide.
Al-Kaabi gave a press conference on 4 January 2018, stating that the new company would save around $550 million in operating costs per year.
2021–present In July 2021, the first delivery of LNG with a
Q-Max carrier was made by Qatargas to the
Krk LNG terminal in
Croatia. This was the first time that Qatargas used the large vessel to deliver 260,000 cubic meters of LNG to a customer. It also delivered its first LNG on a
Q-Flex carrier for the Al-Zour LNG receiving terminal in Kuwaits commission. In August 2021, Qatargas announced the completion of the WHP12N platform jacket for the North Field Production Sustainability (NFPS) project. The drilling support structure is the first to ever be built in Qatar for Qatargas and it was celebrated on the Qcon yard where it was fabricated. The Common
Sulfur Plant (CSP) located in Ras Laffan achieved 10,000 tonnes of produced sulfur per day starting in September 2021. In October 2021, Shell Qatar presented Qatargas with the Reliable Asset Award for 2020 and the beginning of 2021. In November 2021, a project to build
carbon dioxide sequestration facilities at Ras Laffan was announced and would be led by Qatargas along with Axens. The companies TEG technology was the reasoning for the selection of Axens. Qatargas hosted the 17th Engineering Forum in December 2021, which was attended to by over 400 experts in the field of engineering in the gas and oil industries. In January 2022, the Laffan Refinery was visited by a team from ExxonMobil Qatar and presented the facility with an award for outstanding safety performance, with has gone seven years without an injury. Qatargas purchased 10
LNG steam-turbine carriers from various Japanese shipowners. The purchase came about in January 2022 after the charter contracts came to an end and the option to purchase the vessels was possible. Qatargas made deals with
Bangladesh in March 2022 to begin supplying LNG again during the summer while reducing the winter deliveries. In June 2023, Qatargas completed the pre-qualification list for the major contract for all necessary engineering, procurement, construction and installation (
EPCI) requirements for the compression facilities of its North Field Production Sustainability (NFPS) project. In July, Qatargas awarded
McDermott the EPCI for the NFPS Offshore Fuel Gas Pipeline and the Subsea Cables Project (COMP1), which includes the installation of
subsea pipelines, subsea
composite cables,
fiber optic cables and onshore pipelines. In August 2023, Qatar agreed to supply
Hungary with
LNG starting in 2027.
MVM started talks with Qatargas about quantity, pace and shipment. In September 2023, Qatargas changed its name to QatarEnergy LNG. QatarEnergy LNG signed a deal with
PetroVietnam Gas for 70,000 tons of LNG to be delivered in April 2024 to its Thi Via LNG terminal. In March 2026, the first LNG production unit ("train") started at
Sabine Pass USA. Two more units are expected by 2027. The facility costs more than $10 billion, and QatarEnergy shares it with ExxonMobil. ==Operations==