Buildings Inside the passenger building are the ticket office, waiting room, a bar operated by Chef Express, and most of the offices and rooms. The ticket office has a large plaque, placed in 1988, recalling the Vogherese rail workers who have fallen
for freedom or on active service. On the platform adjacent to track 1 are a newsstand and a retailer of tobacco products. Near the newsstand, a plaque unveiled on the 40th anniversary of the 1962 train crash recalls the tragedy. In a lateral building on the Genoa side are the office of the railway police and the public conveniences. Other offices are located in another building, in the direction of Milan. Yet another building once served as the accommodation for visiting rail crew.
Station yard The station yard has seven tracks used for passenger service: •
Track 1: mainly for departing medium and long-distance trains (
regional,
InterCity and
Eurostar City) to
Torino Porta Nuova, as well as some trains to
Alessandria; •
Track 2: mainly for medium and long-distance trains (regional, IC, Eurostar City) towards
Piacenza. In addition to various towns in Emilia, other termini for trains departing from here are
Rimini,
Ancona,
Bari Centrale and
Lecce; •
Track 3: for regional transport: destinations are predominantly
Milan and
Asti; •
Track 4: for almost all departing trains heading towards
Genoa. Other destinations are
Ventimiglia,
Albenga,
La Spezia Centrale,
Livorno Centrale,
Nice,
Novi Ligure,
Arquata Scrivia,
Grosseto; •
Track 5: for InterCity and regional trains heading towards Milan. Some Eurocity trains proceed beyond the
Lombardian capital, to reach
Zürich Hauptbahnhof and
Schaffhausen in
Switzerland; •
Tracks 6 and 7: for regional transportation to and from Milan (
Voghera terminus). Other Milanese stations reached by these trains are
Milano Centrale,
Milano Porta Garibaldi and
Milano Greco Pirelli. A regional train departs from here for
Sesto San Giovanni, and a train operates with limited stops to
Milano Lambrate. •
Dock platform: faces in an easterly direction, and used occasionally for regional trains to Piacenza. A platform adjacent to the passenger building is used to provide access to track 1. To serve the other tracks, there are three island platforms, all of them linked with the passenger building via three
pedestrian underpasses. The island platforms serving tracks 2/3 and 4/5 have full length canopies; the other island platform, which serves tracks 6/7, has no shelter. There are also other tracks, used only by
goods trains. ==Train services==