Half way to Inverness, 1845–1858 Establishment and construction In 1845 the Great North of Scotland Railway was formed to build a railway from
Aberdeen to
Inverness. The proposed route, which needed few major engineering works, followed the
River Don to
Inverurie, via
Huntly and
Keith to a crossing of the
River Spey, and then to
Elgin and along the coast via
Nairn to Inverness. Branch lines to
Banff,
Portsoy,
Garmouth and
Burghead would total . At the same time the Perth and Inverness Railway proposed a direct route over the
Grampian Mountains to
Perth, and the Aberdeen, Banff and Elgin Railway suggested a route that followed the coast to better serve the
Banffshire and
Morayshire fishing ports. Three
private bills were presented to
Parliament seeking permission to build a railway, but the Aberdeen, Banff and Elgin failed to raise funds, and the Perth and Inverness Railway was rejected because the railway would be at altitudes that approached and needed steep gradients. The '''''' (
9 & 10 Vict. c. ciii) received
royal assent on 26 June 1846. In the aftermath of the
railway mania railway companies became an unpopular investment and the necessary finance could not be raised. The company suggested at a meeting in November 1849 that whereas £650,000 was needed for a double-track railway from Aberdeen to Inverness, only £375,000 would be needed for a single-track railway from Kittybrewster, from Aberdeen, to Keith, halfway to Inverness. The meeting recommended that the bridges and works be built wide enough for a second track when this was needed. Construction eventually began in November 1852, albeit to Huntly, short of Keith, with
William Cubitt as engineer. The severe winter the following year delayed work. Between Inverurie and Aberdeen the line took over the
Aberdeenshire Canal, the purchase of which delayed construction as it was necessary to settle the claims of each shareholder individually.
Opening After an inspection by the
Board of Trade, the railway opened to goods on 12 September 1854 and approval for the carriage of passengers was given two days later. The railway was officially opened on 19 September, and two locomotives hauling twenty-five carriages carrying 400 passengers left Kittybrewster at 11 am. The number of passengers had grown to about 650 by the time the train arrived to a celebration at Huntly at 1:12 pm. Public services began the following day. There were stations at: • • Buxburn ( after 1897) •
Dyce •
Kinaldie (open after 1 December) •
Kintore • Inverury ( after 1866) •
Pitcaple •
Oyne •
Buchanstone (open after 1 December) •
Insch •
Wardhouse (open after 1 December) •
Kennethmont •
Gartly •
Huntly The railway was single track with
passing loops at the termini and at Kintore, Inverurie and Insch; the loop at Kittybrewster was clear of the platform to allow the locomotive to run round the carriages and push them into the station. A daily goods train took up to 3 hours 40 minutes for the , the goods to Aberdeen also carried passengers and mail and spared cattle a two-day drive to market. Initially there were three passenger services a day taking two hours, fares being
old pence (d) a mile for first class and d for third; on one train a day in each direction it was possible to travel for the statutory fare of 1d a mile. Although cheaper than travelling by coach, these fares and the charges for the transport of goods were considered high but not reduced for thirty years. The railway opened short of rolling stock as only half of the twelve locomotives and twenty-four of forty passenger carriages ordered had arrived. The carriage builders, Brown, Marshall & Co of Birmingham, stated that based on their experience they had expected the line to open at least two months late. The third day after opening to passengers, on 23 September, there was a collision between two trains at Kittybrewster that resulted in the death of a passenger and several serious injuries. The inquiry found that the driver, attempting to make up time after a late start, had over-run previous stations and been approaching the terminus with excessive speed. The driver attempted to select reverse gear to slow the train but had failed to hold on to the lever, which slipped into forward, propelling the train into carriages waiting at the platform. The report also criticised the station staff, who should not have allowed the carriages to be waiting at the station. The layout at Kittybrewster was altered after the accident.
Waterloo, Keith and Inverness The
Aberdeen Railway (AR) opened from the south to
Ferryhill, south of Aberdeen, in April 1850. It had been previously arranged that the Aberdeen and Great North would amalgamate, but this was annulled that year and the Aberdeen was seeking alliances with railways to the south. In 1854 the AR opened its Guild Street terminus in Aberdeen and the Great North sought and obtained powers for a branch that followed the Aberdeenshire Canal from Kittybrewster to a terminus at
Waterloo by the docks. The line was opened to goods traffic on 24 September 1855 and passengers on 1 April 1856. Kittybrewster station was rebuilt with through platforms and the offices moved to Waterloo station from premises at 75 Union Street. The stations were apart and a goods line was built though the docks linking the two railways, worked by horses as steam locomotives were prohibited. The Inverness and Nairn Railway was authorised in 1854 to build a railway from Inverness to Nairn. The Great North, still seeking to reach Inverness, had objected but withdrew after running rights over the railway were promised. The line was opened on 6 November 1855, and Inverness and Elgin Junction Railway was formed to extend this line to Elgin. The Great North objected again, this time citing the expense of crossing the Spey, but withdrew after it was suggested that the cost of a bridge would be shared. The new company changed its name to
Inverness and Aberdeen Junction Railway, but no final undertaking on running rights was made. The extension of the Great North to Keith was opened on 10 October 1856, with two intermediate stations at and
Grange. Initially five services a day ran between Aberdeen and Keith, taking between 2 hours 40 minutes and 3 hours 5 minutes, although the number of services was later reduced to four. The route between Nairn and Keith authorised on 21 July 1856 required less earthwork, reducing cost, but had steeper gradients than had originally been proposed, and the Great North contributed £40,000 towards a bridge over the Spey. The line reached
Dalvey (near Forres) in 1857, and Keith on 18 August 1858. Three services a day ran the between Aberdeen and Inverness, increasing to five a day east of Keith, and the journey to Inverness took between 5 hours and 55 minutes and 6 hours 30 minutes. The Great North did not insist on running rights west of Keith, but through carriages were probably provided from the start.
Expansion, 1854–1866 Formartine and Buchan Railway Permission to build a line to serve the fishing ports at
Peterhead and
Fraserburgh was received in 1846, but this lapsed during the financial collapse that had followed. Two rival bills were presented in 1856, one by the
Formartine and Buchan Railway and backed by the Great North, and another by the Aberdeen, Peterhead and Fraserburgh Railway. Both companies failed to obtain permission for two years, but in 1858 the Formartine and Buchan Railway was successful. A long railway from
Dyce to Old Deer (renamed in 1867) opened on 18 July 1861 and the main line between Kittybrewster and Dyce was doubled. The branch was extended the to a
station at Peterhead the following year and a long branch north from to
Fraserburgh station opened on 24 April 1865. Three or four services a day ran between Aberdeen, Fraserburgh and Peterhead, with the trains dividing at Maud; travel times were between and hours. The railway was absorbed by the Great North of Scotland Railway on 1 August 1866.
Alford Valley Railway The
Alford Valley Railway left the main line at Kintore for . The railway was authorised in 1856 with the backing of the Great North; most of the company's directors were also on the board of the Great North. The line was steeply graded over a summit at Tillyfourie, at between 1 in 70 and 1 in 75. The line opened in 1859 with a service of four trains a day calling at , and . In 1862 the Great North guaranteed the company's debts and it was subsequently absorbed by the Great North of Scotland Railway on 1 August 1866.
Inverury and Old Meldrum Junction Railway The branch from Inverurie, backed by local residents with funding from the Great North, was authorised on 15 June 1855. The official opening took place on 26 June 1856 with public services starting on 1 July. Journeys took from 18 to 20 minutes to cover the to Old Meldrum with a stop at ; a further station opened in 1866 at . In June 1858 the line was leased to the Great North for a rental of £650 per year (). The railway was absorbed by the Great North of Scotland Railway on 1 August 1866.
Banff, Macduff and Turriff Railways Plans to reach fishing ports at Macduff and Banff from Inverurie were proposed when the Great North was first suggested, but failed because of the lack of financial support. A different route, from
Milton Inveramsay, allowed for a shorter route with easier gradients. Unable to raise sufficient money for a line to the coast, a shorter line to was built. The Great North invested in the railway, and directors sat on the board of the Junction Railway. The new line, together with a junction station at , opened on 5 September 1857. A separate company, the Banff, Macduff and Turriff Extension Railway, built an extension to a station called . The line was operated by the Great North from 4 June 1860, and served an inconvenient terminus high on a hill from
Macduff and from the bridge across the
River Deveron to Banff. Four trains a day ran from Inveramsay, taking between 1 hour 30 minutes and 1 hour 50 minutes, with connections with services to Aberdeen. Both railways were absorbed by the Great North of Scotland Railway on 1 August 1866, and the line was extended to a new station in 1872.
Banff, Portsoy and Strathisla Railway The railway was authorised in 1857 from Grange, on the Great North main line, to
Banff, with a branch from to . The chairman of the company, Thomas Bruce, was also deputy chairman of the Inverness & Aberdeen Junction Railway, with the other directors being made up of local men; most of the investments were raised locally and in small amounts. Most of the line was built with gradients up to 1 in 70, but the half-mile of 1 in 30 goods line to the harbour at Portsoy was restricted to one locomotive and four wagons. The railway opened on 30 July 1859, with public services starting on 2 August following a derailment on the opening day. Services connected with the Great North at Grange. With the railway struggling to pay the interest on its debt, in 1863 the Great North took over running the services and the line renamed the Banffshire Railway. The Great North provided three trains a day between Grange and Banff that connected at Tillynaught for Portsoy, and two trains a day along the coast between Banff and Portsoy. Permission for a extension from Portsoy to Portgordon was given, but the necessary investment could not be found. Amalgamation with the Great North was authorised in 1866, but financial problems delayed this until 12 August 1867, and the Portgordon extension was abandoned.
Keith and Dufftown Railway The Great North sought to have its own route west of Keith, with
Grantown-on-Spey as an objective, where it hoped to meet any possible line between Perth and Inverness. To this end, it invested in the Keith and Dufftown Railway; this company was incorporated on 27 July 1857, but lack of money slowed progress. Powers for a longer, but cheaper, route between the two towns were secured on 25 May 1860. The revised route included steeper gradients than those planned in 1857; the maximum gradient was now 1 in 60 instead of 1 in 70. There was a viaduct over the
Fiddich of two spans, and there were three intermediate stations: Earlsmill (renamed in 1897), Botriphnie (renamed in 1862) and . When the line opened on 21 February 1862, the trains were worked by the Great North under an agreement dating from the formation of the company. The railway was absorbed by the Great North of Scotland Railway on 1 August 1866.
Strathspey Railway With promises of substantial goods traffic of iron and timber and from the local whisky distilleries, extension of the line to Dufftown into Strathspey was sought and obtained on 17 May 1861. The Strathspey Railway was sponsored by the Keith & Dufftown and Great North of Scotland railways, who appointed directors to the board, and the Great North undertook to run the services. The line first headed north to meet an extension of the Morayshire Railway at Strathspey Junction (called from 1864), before following the River Spey to
Abernethy. The
Strathspey Railway Act 1861 (
24 & 25 Vict. c. xvi) also permitted a branch to the proposed
Inverness and Perth Junction Railway at Grantown-on-Spey. The gradients were not severe, but the route required the Spey and its tributaries to be crossed many times, with three bridges built over the river itself. The line was placed in cuttings greater than deep, and there was one long tunnel. The line was opened on 1 July 1863 to Abernethy (later called ). The line between Dufftown and Craigellachie became the main line and services continued over the Morayshire Railway, opening up a route between Keith and independent of the Inverness and Aberdeen Junction Railway (IAJR). The kept most of the through traffic as its line was more direct, only instead of via the Great North route. The Great North ran four trains a day from Elgin to Keith via Craigellachie, with through carriages or connections for three trains for Aberdeen at Keith. Connections at Elgin were poor because travel over the two routes took a different length of time. The line from Craigellachie became a branch with three trains a day calling at all stations at an average speed of about . The link to Grantown-on-Spey was not built, but on 1 August 1866 services were extended to meet the (now the
Highland Railway) at . The railways met north of Boat and conflict arose over the manning of the signalbox at the junction, with the Highland refusing to make any contribution. For a while between March and June 1868 Great North services terminated at Nethy Bridge, after which separate tracks side by side were provided for both companies to Boat. Prompt connections were available with the Great North at Craigellachie, but there was usually a long wait for connections with the Highland at Boat. The railway was absorbed by the Great North of Scotland Railway on 1 August 1866, and the line's main source of income came from the local distilleries.
Morayshire Railway A double-track railway had been proposed from
Lossiemouth to
Craigellachie in 1841 and necessary permissions granted in the
Morayshire Railway Act 1846 (
9 & 10 Vict. c. clxxviii), the route having changed to take advantage of the proposed Great North of Scotland Railway between Elgin and Orton. The financial situation delayed construction, but work eventually started on the section from Lossiemouth to Elgin in 1851. The line opened on 10 August 1852 with a special train from Elgin to festivities in Lossiemouth. Public services started the next day with five services a day, each taking 15 minutes with two request stops. First and second class accommodation was provided at d and 1d a mile. However, it was the Inverness and Aberdeen Junction Railway (IAJR) who was to build the line from Elgin to Orton; permission to build a branch from this line to
Rothes was granted to the Morayshire in the
Morayshire Railway (Extension) Act 1856 (
19 & 20 Vict. c. lxxxvi) on 14 July 1856. The IAJR built its own station at Elgin, linked to the Morayshire's station by a junction to the east. The IAJR opened on 18 August 1858 and the Morayshire Railway started running services on 23 August. Initially the Morayshire ran trains over the IAJR, but its lightweight locomotives struggled with the gradients and proved unreliable, and after six weeks carriages were attached and detached from IAJR trains at Elgin and Orton. Conflict arose over through ticketing, and the directors of the Morayshire responded with plans to build its own line between the two stations. The Great North sponsored the new line and offered to provide services after the lines had been physically connected. Permission was granted on 3 July 1860, goods were carried from 30 December 1861 and passengers from 1 January 1862, reducing the travel time from 55 to 45 minutes. The Morayshire station at Elgin was enlarged in anticipation of Great North services, albeit in wood. In 1861 permission was granted to the Morayshire Railway to cross the Spey and join with the Strathspey Railway at Craigellachie. The Morayshire extension and the Strathspey both opened on 1 July 1863 and the Great North provided a service of four trains a day over the line, which gave an alternative route between Keith and Elgin. On 30 July 1866 permission was given to the Morayshire and Great North to amalgamate with agreement, and the loss-making services between Orton and Rothes were withdrawn without notice the following day. It would be August 1881 before the Morayshire became fully part of the Great North.
Aberdeen joint station The wooden station building at Waterloo was a from the Aberdeen and Deeside's Guild Street station and passengers were conveyed between the termini by omnibus, paid for in the through fare and with forty five minutes being allowed for the transfer. The Great North refused to hold its trains to connect with those arriving at Guild Street and insisted that tickets were purchased at least five minutes before the train was due to depart. The mail train would be held until the Post Office van had arrived and the mail was on board, but the station locked at the advertised departure time to prevent connecting passengers further delaying the train. This inconvenienced passengers, as was pointed out to the general manager during a parliamentary committee meeting by a
member of parliament who had missed a connection, although his family and luggage had been sent on. The Great North promoted onward traffic by sea and approached the
Aberdeen Steam Navigation Company to see if rates could be reduced for through traffic and through ticketing by rail was not available until 1859, when the Great North joined the
Railway Clearing House. A joint line through the Denburn Valley to link the Great North to the south had been planned, and the Great North had approached the railways using the Guild Street station in 1853 and 1857 but were unhappy with the assistance that had been offered. Permission was granted in 1861 to the Inverness and Perth Junction Railway to build a line from , on the Inverness and Aberdeen Junction Railway, direct to Perth. The Great North protested, and won the right for a booking office in Inverness. The line opened in 1863 and in 1865 the Inverness & Perth Junction and Inverness & Aberdeen Junction merged to become the Highland Railway. The Aberdeen Railway, which had now been absorbed by the
Scottish North Eastern Railway (SNER), approached the Great North, concerned that the new line had bypassed Aberdeen, but no agreement was reached. The Limpet Mill Scheme was a line presented in an 1862 bill by the nominally independent Scottish Northern Junction Railway, but supported by the SNER. This proposed a long railway between Limpet Mill, to the north of on the SNER, to the Great North at Kintore. A junction with the Deeside Railway was also planned, over which the SNER unsuccessfully tried to obtain running rights. Unpopular, this was given permission by Parliament, but the Great North succeeded in inserting a clause that this would be suspended if it obtained its own act of Parliament by 1 September 1863. The Great North proposed a route, known locally as the
Circumbendibus, that was longer but cheaper than the direct route through the Denburn Valley. Despite local opposition, the route was approved by Parliament in the
Great North of Scotland Railway (Aberdeen Junction) Act 1863 (
26 & 27 Vict. c. clxiv), but was revoked the following year when the SNER obtained permission in the
Denburn Valley Railway Act 1864 (
27 & 28 Vict. c. cxi) for a railway through the Denburn Valley. The Great North contributed the £125,000 that its Circumbendibus line would have cost and the SNER contributed £70,000 out of the £90,000 it had been prepared to advance the Limpet Mill Scheme. The SNER built the double-track railway, culverting the Denburn and digging two short tunnels. The joint station opened on 4 November 1867 and consisted of three through tracks, one with a long platform, together with two bay platforms for terminating trains at either end. Two lines to the west were provided for goods traffic, and the stations at Waterloo and Guild Street closed to passengers and became goods terminals. The line to the north of the station passed to the Great North and the long Hutcheon Street tunnel became its longest.
Deeside Railway A railway to serve
Deeside was authorised on 16 July 1846, but it was decided to wait for the Aberdeen Railway to open first. The company survived after the railway mania as the Aberdeen Railway bought a large number of shares. Interest in the line was restored after
Prince Albert purchased
Balmoral Castle, to which the Royal Family made their first visit in 1848, and the Aberdeen Railway was able to sell its shares. Investors were still hard to find, but a line as far as
Banchory was ceremonially opened on 7 September 1853; public services began the following day with three trains a day that took about an hour. First class accommodation was available for d a mile, reduced to 1d a mile for third class. Initially services were operated by the Aberdeen Railway to its terminus at Ferryhill, and the Deeside Railway used a horse to shunt wagons at Banchory. In 1854 the Deeside introduced its own rolling stock and ran through to the Aberdeen's Guild Street station which opened the same year. A new company, the Aboyne Extension, was formed to reach . Instead of building two bridges across the Dee, as had been proposed in 1846, the railway instead took a cheaper but longer route through
Lumphanan, and services were extended over the new line on 2 December 1859. The
Aboyne and Braemar Railway was formed by the
Aboyne and Braemar Railway Act 1865 (
28 & 29 Vict. c. cclxxix) to build a line from Aboyne the to
Braemar. The line was to follow the Dee before crossing it from Braemar, but the plans were modified to terminate the line at
Bridge of Gairn with the passenger terminus short at . This route opened to Ballater on 17 October 1866, and the line to Bridge of Gairn remained unfinished. By 1855 there five services a day over the long line, taking between 1 hour 50 minutes and hours. The Royal Family used the line from 1853 to travel to Balmoral Castle; in September 1866 the
British Royal Train used Ballater station nearly a month before public services reached the station. At first
Queen Victoria visited once a year, this becoming twice a year after Albert died in 1861. The number of visits returned to one a year after
Edward VII became king in 1901. From 8 October 1865 a daily 'Messenger Train' ran when the Royal Family was at Balmoral. First class accommodation was available on these trains; accompanying servants were charged third class fares. In the late 1850s and early 1860s the Great North and the Scottish North Eastern Railway (SNER) were in conflict over the joint station in Aberdeen. Frustrated with lack of progress, the SNER proposed a new line that crossed the Deeside Railway. Whilst in discussions with the SNER about a link from this new line to the Deeside, a lease for the Deeside Railway was offered to the Great North, which was rapidly accepted. The Deeside board accepted the lease by a majority vote on 13 May 1862, and it was approved by Parliament in the
Great North of Scotland Railway (Amalgamation) Act 1866 (
29 & 30 Vict. c. cclxxxviii) on 30 July 1866. The Aboyne and Braemar remained independent, although services were operated by the Great North.
Amalgamation After opening to Keith in 1854 the Great North of Scotland Railway operated over of line. Ten years later this had almost quadrupled but more than three-quarters was over leased or subsidiary railways. Eventual amalgamation with many of these railways had been prompted from the start. The necessary authority was sought and on 30 July 1866 the '
(29 & 30 Vict. c. cclxxxviii) received royal assent, this act also permitting the Great North to lease the Deeside Railway. The other companies merged two days later, except the Banffshire and Morayshire, which had started as separate undertakings and were not included in the 1866 act of Parliament, although permission for the Banffshire to merge was gained the following year in the ' (
30 & 31 Vict. c. cxc). After the extension of the Deeside opened in 1866 and the merger of the Banffshire the following year the Great North of Scotland Railway owned of line and operated over a further .
Austerity, 1866–1879 In 1855, the first full year after opening, the Great North of Scotland declared a
dividend of per cent, which rose to the following year and 5 per cent in 1859. The dividend reached a maximum of per cent in 1862 before dropping to 7 per cent the following year and 5 per cent in 1864, but in 1865 the directors could not pay any dividend on ordinary shares. At the directors' suggestion a committee was set up to look into their actions; the report's main recommendation was the abandonment of the Port Gordon extension. The opening of direct route over the Highland Railway to the south had lost the through mail business, resulting in the withdrawal of Sunday services, and had lost revenue equivalent to a five per cent dividend. Joining the Clearing House system had resulted in the loss of twenty-five per cent of goods traffic income and the conflict over the joint station in Aberdeen had been expensive and resulted in an overpriced lease on the Deeside. The collapse of
Overend, Gurney and Company Bank in 1866 meant that for three months the bank rate rose to 10 per cent, making the company's financial situation worse. The whole board resigned and six members did not seek re-appointment. At the beginning of 1867 the company owed £800,000 () and the new board imposed austerity measures. It would be 1874 before most of the company's debt was settled and it became possible to pay a dividend again. The only line built in the early 70s was the to Macduff and few carriages and no locomotives were built until 1876. The Deeside Railway merged in 1875, the Aboyne and Braemar extension to Ballater in January 1876, and the Morayshire Railway was absorbed in 1880. After an engine boiler exploded at Nethy Bridge in September 1878, the inquiry found the testing of boilers infrequent and inadequate. It was sixteen months before the locomotive was repaired.
Renaissance, 1879–1899 Renewal and extension In 1879 the chairman, Lord Provost Leslie, died and was replaced by William Ferguson of Kinmundy. The following year both the Secretary and General Manager resigned and William Moffatt was appointed to both posts, and A.G. Reid became Superintendent of the Line. The railway was now paying a dividend and seeing increased traffic, but rolling stock, track, signals and stations all needed replacing in a project that was to cost £250,000 (). By June 1880 the main line was doubled as far as Kintore, and over the next five years of iron rail track, much of it without
fishplates, was replaced with steel rails and the main line doubled between
Dyce and
Inveramsay. The railway had acquired a reputation for running slow trains on a perverse timetable and ill-treating its passengers, and now resolved to address this. By the mid-1880s services were faster, there was upholstery in third class and the branches saw an accelerated service as a result of running fewer mixed trains. On 27 November 1882 Inverythan Bridge on the Macduff Branch near collapsed as a locomotive hauling five goods wagons, a brake van and four carriages crossed. The locomotive and tender crossed the bridge, but the wagons and carriages fell to the road below, killing five people who had been travelling in the first and second carriages and injuring fifteen others. The Board of Trade report found that the collapse was due to an internal fault in a cast-iron beam that had been fitted when the bridge had been built in 1857. A bill was introduced to Parliament in 1881 to extend the line from Portsoy along the
Moray Firth to
Buckie, to be opposed by the Highland and rejected. The following year both the Great North and Highland railways applied to Parliament, the Great North for a line from Portsoy along the coast through Buckie to Elgin, and the Highland for a branch from Keith to Buckie and
Cullen. Authority was granted, but in the case of the Highland Railway only for a line as far as
Portessie, with running rights over the Great North coast line between Buckie and Portsoy and the Great North obtaining reciprocal rights over the Highland railway between Elgin and Forres. The coast line opened in stages, the outer sections from Portsoy to Tochieneal and Elgin to Garmouth opening in 1884. The centre section, which involved heavy engineering, with a long viaduct with a central span of over the
Spey at Garmouth and embankments and viaducts at Cullen, opened in May 1886. The line was served by four trains a day and a fast through train from Aberdeen that reached Elgin in hours. The Highland Portessie branch had opened in 1884 and the Highland did not exercise its running rights over the Coast Line, thus preventing the Great North running over its lines west of Elgin. The Great North had opened using a system of telegraphic train orders, and as the signalling was being upgraded this was being replaced with electric tablet working over the single line sections. Now express trains had to slow to exchange tokens in a process that frequently left railwaymen injured, so James Manson, the locomotive superintendent, designed an automatic token exchange system based on apparatus used to move cotton in a factory. At first tokens were exchanged at , but soon they were exchanged at line speed. After trialling on the Fraserburgh line, the system was installed on the coast route in May 1889, and by 1 January 1893 it was in operation on all single-line sections.
Aberdeen to Inverness The Great North and Highland had agreed in 1865 that Keith would be the exchange point for traffic between the two railways, but in 1886 the Great North had two lines to Elgin that, although longer than the Highland's direct line, served more populous areas. The coastal route between Keith and Elgin was long but had easier gradients than the via Craigellachie. The Highland's main line south from Inverness was via Forres, the Great North believing that their competitors treated the line to Elgin as a branch. In 1883 a shorter route south from Inverness was promoted by an independent company, the bill defeated in parliament only after the Highland had promised to request authority for a shorter line. The following year, as well as the Highland's more direct line from Aviemore, the Great North proposed a branch from its Speyside Section to Inverness. The Highland Railway route was chosen, but the Great North won a concession that goods and passengers that could be exchanged at any junction with through bookings and with services conveniently arranged. . In 1885 the Great North re-timed the 10:10 am Aberdeen service to reach Keith at 11:50 am with through carriages that reached Elgin via Craigellachie at 1 pm. This connected with a Highland service at both Keith and Elgin, until the Highland re-timed the train and broke the connection at Elgin. The Great North applied to the Board of Trade for an order for two connections a day at Elgin. This was refused, but in 1886 the Great North and Highland railways came to an agreement to pool receipts from the stations between Grange and Elgin and refer any disputes to an arbiter. The midday Highland train was re-timed to connect with the Great North at Keith and Elgin, and a service connected at Elgin with an Aberdeen train that had divided en route to travel via the coast and Craigellachie. In 1893 the Highland cancelled the traffic agreement and withdrew two connecting trains, complaining that they were unprofitable. One of the trains was reinstated after an appeal was made to the
Railway and Canal Commissioners and a frustrated Great North applied to parliament in 1895 for running powers to Inverness, but withdrew after it was agreed that the Railway and Canal Commissioners would arbitrate in the matter. With no judgment by 1897, the Great North prepared to apply again for running powers over the Highland to Inverness, this time agreeing to double track the line, but the commissioners published their finding before the bill was submitted to Parliament. Traffic was to be exchanged at both Elgin and Keith, the services exchanged at Elgin needed to include through carriages from both the Craigellachie and the coast routes, and the timetable had to be approved by the commissioners. The resulting Commissioners' Service started in 1897 with eight through services, four via the Highland to Keith taking between and 5 hours, and four with carriages exchanged at Elgin with portions that travelled via Craigellachie and the coast, two of these taking hours. The 3 pm from Inverness to Aberdeen via Keith took 3 hours 5 minutes. Initially portions for the coast and Craigellachie divided at Huntly, but Cairnie Platform was opened at Grange Junction in summer 1898. The main line was double track to Huntly in 1896 and Keith in 1898, except for a single-track bridge over the Deveron between Avochie and Rothiemay, which was replaced by a double-track bridge in 1900.
Subbies and hotels In 1880 an express was introduced on the Deeside Line, taking 90 minutes to travel from Aberdeen to Ballater; by 1886 this had reduced to 75 minutes. In 1887 the service between Aberdeen and Dyce had improved with more local trains and new stations; by the end of that year there were twelve trains a day, eventually becoming twenty trains a day calling at nine stops in twenty minutes. The trains were initially called the
Jubilees, as it was
Queen Victoria's Golden Jubilee, but became known as the
Subbies. Suburban services were also introduced between Aberdeen and Culter on the Deeside Line in 1894, after the track had been doubled, starting with ten down and nine up trains calling at seven stops in twenty-two minutes. The number of trains was eventually doubled and an additional station provided. In 1891 the company offices were moved from Waterloo to a new building in Guild Street with direct access to the station. The same year the Great North took over the Palace Hotel (closed after a fire in 1941), near the joint railway station in Aberdeen and modernised it, installing electric lighting and building a covered way between the hotel and station. Encouraged by its success, the company obtained permission in the ''''
(56 & 57 Vict. c. cci) to build an hotel and golf course at Cruden Bay, about north of Aberdeen. The hotel was linked to the Great North by the Boddam Branch, a new single-track branch from Ellon, on the Buchan section, which served Cruden Bay and fishing town at Boddam. The line opened in 1897 with services from Ellon taking about forty minutes. The hotel opened in 1899, connected to the railway station by the Cruden Bay Hotel Tramway. This was nearly long, with a gauge of and operated by electric tramcars that took power from an overhead line. Seasonal through services to Aberdeen began in 1899 with an up service in the morning; for some years an afternoon up service returned in the evening. Excursions for tourists had operated on the Deeside Line from 1881, later joined by special services on the Strathspey Line and the Coast Line alongside the Moray Firth, promoted as the Scottish Riviera''.
Maturity, 1900–1914 There was interest at the end of the 19th century in using the new
Light Railways Act 1896 to approve lines to serve rural areas. The long Aberdeenshire Light Railway was independently promoted in 1896 to serve
Skene and
Echt, with tracks laid along the public roads in Aberdeen. The Great North proposed an alternative Echt Light Railway and a line to
Newburgh that would both use the
Aberdeen tramway tracks in the city. In 1897 a line from Echt to Aberdeen was approved, but only as far the city outskirts after opposition to laying tracks in the public roads or using the tramways for goods traffic. The plans were changed to connect the line with the Great North at Kittybrewster, but the scheme abandoned after the costs had started to rise. The Great North was granted a
light railway order, the
Fraserburgh and St. Combs Light Railway Order 1899 on 8 September 1899 for a light railway from Fraserburgh to
St Combs. The order included a clause, unusual for the time, permitting the use of electric traction; but the company opted for steam traction, and the locomotives were fitted with
cowcatchers as the line was unfenced. Services started on 1 July 1903, with six trains a day that took 17 minutes to complete the journey. A light railway was proposed to cover the from Fraserburgh to
Rosehearty, but the scheme was abandoned after opposition to laying tracks on the public road. Finding its locomotive works at Kittybrewster cramped and inadequate, the Great North began construction on a new
works at Inverurie in 1898, electric lighting being provided in the buildings. The carriage and wagon department moved in 1901, the locomotive department in 1902, the offices the following year and the permanent way department in 1905; the buildings still stand and are
listed Category B. Inverurie station was rebuilt nearer the works in 1902, and is similarly a Category B building. The Great North built houses nearby for its staff, lit by electricity generated at the works, and the
Inverurie Loco Works Football Club was formed by staff in 1902. The Great North rebuilt Elgin station in 1902 to replace a temporary wooden building dating from the 1860s, a joint structure with the adjacent station having been declined by the Highland Railway. Following negotiations, amalgamation of the Highland and the Great North of Scotland Railways was accepted by the Great North shareholders in early 1906, but the Highland board withdrew after opposition from a minority of its shareholders. The Aberdeen and Inverness trains were jointly worked after 1908 and locomotives were no longer exchanged at Keith or Elgin; between 1914 and 1916 the Highland paid the Great North to provide locomotives for all of the services through to Inverness. In spring 1904 the Great North began a motor omnibus service to Braemar, connecting with trains at Ballater. These early buses had solid tyres and a legal speed limit of , but were faster than the horse-drawn coaches they replaced. By 1907 buses connected with Great North train services and conveyed passengers to
Strathdon,
Midmar, Echt,
Cluny Castle and
Aberchirder, between
Cock Bridge and
Tomintoul a horse-drawn coach was used as the motor buses could not ascend the steep road. Services from Aberdeen connected with trains at , where a refreshment room was built. In 1914 the railway had 35 passenger road vehicles that, together with 15 five-ton lorries, worked daily. Aberdeen joint station was congested, resulting in delayed trains, and the low, open platforms were frequently covered in oily slime due to the large quantities of fish that passed through. Agreement with the
Caledonian Railway over rebuilding the station had been reached in 1899, but the companies fell out over widening the line to the south. Moving the goods station to the east was similarly complex, with conflicts with the harbour commissioners and the town council. In 1908 new platforms on the western side opened and the adjoining station hotel was bought in 1910. Foundations for the new building were laid in 1913 and the station was largely complete by July 1914, although outbreak of war delayed further progress and the station was finally completed in 1920.
War and grouping, 1914–1922 With
Britain's declaration of war on the German Empire on 4 August 1914, the government took control of the railways under the
Regulation of the Forces Act 1871 (
34 & 35 Vict. c. 86). Day-to-day operations were left in the control of local management, but movements necessary for the war were coordinated by a committee of general managers. The Great North of Scotland's main role was providing a relief route when the Highland Railway route south to Perth was congested, on one Sunday conveying twenty-one troop specials from Keith to Aberdeen. Timber from the forests of the north of Scotland were carried from sidings at Kemnay, Knockando and Nethy Bridge. A total of 609 staff left to serve in the war, and a memorial to the 93 who died in action was erected at the offices in Aberdeen. Services were maintained until 1916, when staff shortages reduced services, although no lines were closed. The railways were in a poor state after the war, costs having increased, with higher wages, the introduction of an
eight-hour day and increased price of coal. A scheme was devised whereby the railways would be grouped into four large companies; this was approved by Parliament as the
Railways Act 1921. At the start of the 20th century the company's shares had been restructured; the final dividends were 3 per cent on preferred stock, unaltered from previously, and per cent on ordinary stock, slightly above average. Before grouping the Great North of Scotland Railway operated of track.
London and North Eastern Railway On 1 January 1923 the Great North of Scotland became an isolated part of the Scottish division of the
London and North Eastern Railway (LNER), the Caledonian to the south and Highland to the west both becoming part of a different group, the
London, Midland and Scottish Railway. That summer a sleeping carriage operated between Lossiemouth and , and a through carriage ran from to Cruden Bay on Fridays. Sunday services were re-introduced; from 1928 Aberdeen suburban services ran hourly during the afternoon and evenings. Afterwards the economic situation deteriorated and the railway companies advised the trade unions in 1928 that wages would need to be cut; this was implemented in August 1930 after the
Wall Street crash the previous year. Economy measures were introduced and unprofitable passenger services withdrawn, the Oldmeldrum branch closing on 2 November 1931 and the branch to Cruden Bay and Boddam on 31 October 1932. Road transport was arranged for guests at the Cruden Bay hotel, from Ellon for the first summer season, and then from Aberdeen. Carriages were transferred in to replace the older four-wheelers, former
North Eastern Railway vehicles in 1924–25 and fifty former
Great Eastern Railway six-wheelers between 1926 and 1929 for the Aberdeen suburban services. By 1936 more up to date
Gresley bogie carriages were used on the primary trains. Optimism returned and traffic increased after 1933, and a luxury rail land cruise, the "Northern Belle", ran over former Great North lines. However, the Aberdeen subbies had been losing money for some time as a result of competition from the local buses, and from 5 April 1937 the local services between Aberdeen, Dyce and Culter were withdrawn and most of the intermediate stations closed. The railways were again placed under government control on 1 September 1939, and
Britain was at war two days later. The Cruden Bay Hotel was used as an army hospital and the tramway ceased operating in 1941. Handed back to the railway in 1945, it never reopened. The Palace Hotel burnt down in 1941. The Station Hotel was used as an admiralty administrative centre, and reopened in 1950 after refurbishment.
British Railways Britain's railways were nationalised on 1 January 1948 and the former Great North of Scotland Railway lines were placed under the control of the
Scottish Region of
British Railways. To reduce costs the Alford branch was closed to passengers on 2 January 1950, followed by the Macduff Branch on 1 October 1951. The
1955 Modernisation Plan, known formally as the "Modernisation and Re-Equipment of the British Railways", was published in December 1954, and with the aim of increasing speed and reliability the steam trains were replaced with electric and diesel traction. In 1958 a battery-electric railcar was introduced on the Deeside Line and a diesel railbus on the Speyside Section.
Diesel Multiple Units (DMU) took over services to Peterhead and Fraserburgh in 1959 and from 1960 cross-country types were used on an accelerated Aberdeen to Inverness service that allowed hours for four stops. By 1961 the only service still using steam locomotives was the branch from Tillynaught to Banff. In 1963
Dr Beeching published his report "The Reshaping of British Railways", which recommended closing the network's least used stations and lines. Only the Aberdeen to Keith main line survived, albeit without its stopping services and the remaining former Great North lines closed to passengers. The Lossiemouth and Banff branch closed in 1964 and the following year the St Combs branch, line from Dyce to Peterhead and Fraserburgh and the Speyside section closed and local services to Inverurie were withdrawn. Attempts to save the Deeside section to Banchory failed and it closed in 1966. On 6 May 1968 services were withdrawn on the Coast Line, the former Great North line via Craigellachie and the local services between Aberdeen and Elgin. The Beeching Report had recommended Inverurie and Insch stations for closure, but these were saved by the subsequent inquiry. The goods service at individual stations was also withdrawn after Beeching's report. A
freightliner depot opened at Aberdeen in 1966, allowing the Peterhead line to close completely on 7 September 1970. In 1969–70 the line between Aberdeen and Keith was singled, with passing loops, the line to Fraserburgh closing completely in 1979 and that from Keith to Dufftown in 1985. In the 1969 timetable there were early morning trains between Aberdeen and Inverurie, and five services a day between Aberdeen to Inverness, supplemented by two Aberdeen to Elgin services that by the late 1970s were running through to Inverness. The cross-country DMUs were replaced in 1980 by diesel locomotives hauling
Mark I compartment coaches, later
Mark II open saloons. These were similarly replaced in the late 1980s and early 1990s by newer DMUs, first the
Class 156 Super Sprinter and then
Class 158 Express and
Class 170 units.
Legacy The
Aberdeen to Inverness Line currently uses the former Great North of Scotland Railway line as far Keith with stations at Dyce, Inverurie, Insch, Huntly and Keith. Eleven trains a day run between Aberdeen and Inverness, taking about hours, supplemented between Aberdeen and Inverurie by approximately the same number of local trains. In a project scheduled for completion in 2030, the line is to be improved to allow a regular hourly Aberdeen to Inverness service, additional commuter trains into Inverness and Aberdeen and new stations at Kintore and Dalcross, near Inverness airport. Heritage and tourist railways also use the former Great North of Scotland Railway alignment. The
Keith and Dufftown Railway runs seasonal services over the between Keith Town and Dufftown using
Class 108 diesel multiple units. The
Strathspey Railway operates seasonal services over the former Highland Railway route from to
Grantown-on-Spey via the joint Highland and Great North Boat of Garten station. The
Royal Deeside Railway operates over of former Deeside Railway at Milton of Crathes near Banchory during summer weekends and in December, and based at Alford railway station is the
Alford Valley Railway, which seasonally operates a narrow gauge railway. Former alignments have been opened as long distance
rail trails for pedestrians, cyclists and horses. The
Formartine and Buchan Way runs from
Dyce to
Maud before dividing to follow the two branches to Peterhead and Fraserburgh. The
Deeside Way is open between Aberdeen and
Kincardine O'Neil and
Aboyne and
Ballater.
Nestrans (The North East of Scotland Transport Partnership), the organization responsible for local transport strategy, consider that building new railways along these routes would not be beneficial at the moment but the alignments are protected from development. ==Rolling stock==